Laserfiche WebLink
EXHIBIT A <br /> EXHIBIT B <br /> CALCULATION OF $1,998,236 TRANSFER <br /> FROM <br /> REGIONAL REPLACEMENT FUND <br /> — Length or Quantity $/Foot or$/Qty Valuation ($) <br /> 42" Pipeline 5,106 336 $ 1,715,616 <br /> 48" Pipeline 306 470 $ 143,820 <br /> Manholes 16 8,675 $ 138,800 <br /> Total: $ 1,998,236 <br /> Per foot and per quantity costs are derived from the 2017 Dublin Trunk Sewer Line rehabilitation <br /> project and have been escalated to 2022. These costs do not include sewer bypass. <br /> 6 <br />