Laserfiche WebLink
#/GACBvy CONTRACT PRICING WORKSHEET Contract Date <br /> 777 FS 12-19 6/14/22 <br /> For MOTOR VEHICLES Only No.: Prepared: <br /> This Worksheet is prepared by Contractor and given to End User. If a PO is issued,both documents MUST be <br /> faxed to H-GAC 713-993-4548. Therefore please type or print legibly. <br /> Buy int: CIty u1 Pleasanton-I.nermorePleasantonDireDepartment contractor: Boise Mobile Equipment <br /> Agency: <br /> Conrad David Luera,Operations Superintendent P. pied Sheree Surber <br /> Person: Bc: <br /> Phone: 925-404-4200 phone: 208-681-7418 <br /> Fax: Fax: 208-344-0395 <br /> Email: dluera@cityofpleasantonca.gov Email: shereeubmefire.com <br /> Product BME,Type 6"X-Treme"Dodge 55011,Full Aluminum Body,300 Gallon Water Tank,Darley 1-1/2 AGE Pump,Off Raod <br /> Code: FS19DB11 Description: Package <br /> :A::PrOaliet:lie]m:Ease Unit P►lite:Per:Coiit+ cterts W-t1 CCM:D* t: ::::::::::•:•::::::::::::::::: $233,172.00 <br /> :B;T'lililisheIf Options:=ileitti'ze betosv-Alhat�i adailKonal slieet(sk if n.ecessaly-i�xe7�rtle:Oxitiotr Coax iti:de3c itiett if alipiicable.:::: : : : <br /> {Ix3dte PuBFi"sh'ed:Options are o{rtioos wGich were ubrhifted and priced iirCohtfactoi's:bid.a_:::•:;:;: <br /> . . . . . . . . . . . . . . . <br /> Description Cost Description Cost <br /> • <br /> Subtotal From Additional Sheet(s): <br /> Subtotal B: $ - <br /> C:linjiob�lis6e1.bprions:=itemize:bcldiy:/atiach:atldrtienal s(teet(s�:ifnecessary.::::: :: <br /> CDotei:gg1.bi i hcd ojrtii ng:ttreitcros:v4i eb dyer net spbpaittgd ar-d . <br /> Description Cost Description Cost <br /> Customaint(solid)( ) $ 10,000.00 Foam Pro 1601 $ 5,389.00 <br /> FRC backup camera w/7"color display,installed $ 1,217.00 Subtotal From Additional Sheet(s): <br /> $ 15,130.00 <br /> Custom BME-fabricated front bumper $ 3,1 1 1.00 I Subtotal C: $ 34,847.00 <br /> Check:Total cost of Unpublished Options(C)cannot exceed 25%of the total of the Base Unit <br /> For this transaction the percentage is: 15% <br /> Price plus Published Options(A+B). <br /> D,TptalG4st$efore ttix?ClOITai>?e1ra�e=triiQtller ll4iyie:UceS:/:Discoaitts(A-i 0::::::::::::::::::::::: : ::: : : : ::: :.:::::::::i <br /> . . . . . . . . . . . . . . . . . . <br /> Quantity Ordered: 3 X Subtotal ofA+B+C: $268,019.00 = Subtotal D: $804,057.00 <br /> 1GGAC Orilerr Proeessing Charge(Amount Per Chrreut 1'o]icxX;:;: :::: :::::::::;::::II Subtotal E: $ 1,000.00 <br /> �F.:Tr�de-[tis 1'Dther A1totvaitc:es:/:Spl ctal:DI9etiunta 1 fieSght%:Iirstalhltibri ;::.:::::::::: ;::::::::::.:::::: ;:::::; ;::::•:::::.::::::: <br /> Description Cost Description Cost <br /> Final inspecation in Boise-(1 Trip,2 persons) $ 4,000.00 Chassis Surcharge @ 11,927 per unit $ 35,781.00 <br /> VIN Verification&Registration Included Multi-Unit Discount @$5,000 per unit $ (15,000.00) <br /> Delivery to Department Included Subtotal F: $ 24,781 00 <br /> • • : :;tjelivei Date: 30-Jun-24 : Price.(64E-Wji: $829,838.00 <br />