Laserfiche WebLink
Attachment B <br /> www.callanderassociates.com <br /> Recreate <br /> Educate <br /> Live+Work <br /> Connect <br /> Via Email Sustain <br /> December 7, 2021 <br /> MEMO TO: Matt Gruber, City Landscape Architect <br /> City of Pleasanton <br /> FROM: Zach Katz, Jab Captain <br /> Callander Associates <br /> RE: NEVADA STREET IMPROVEMENTS CD'S/fee re-allocation <br /> Matt, <br /> The anticipated scope of work for the Bernal intersection was that the improvements designed <br /> by CSG would be surveyed after they had been constructed in the Fall. Our design team would <br /> then show any required modifications on our plans. <br /> Based on the City's direction to coordinate the improvement of the Bernal Ave intersection with <br /> the CSG intersection project, we have provided additional services that were unanticipated. <br /> Those services included: <br /> • Site walk with CSG to confirm design direction and schedule <br /> • Various coordination efforts with design team and City <br /> We propose to re-allocate$3,296 that had been set aside for optional services task 2.06 <br /> (materials board) and 2.07 (color rendered plan) to our overall 2.0 phase to address the <br /> additional time involved in the Bernal intersection work. <br /> Please let us know if you approve this fee re-allocation. <br /> Sincerely, <br /> Zach Katz <br /> BURLINGAME GOLD RIVER SAN JOSE <br /> 1633 Bayshore Highway,Suite 133 12150 Tributary Point Drive,Suite 14 2025 Gateway Place,Suite 285 <br /> Burlingame,CA 94010 Gold River,CA 95670 San Jose,CA 95110 <br /> 650.375.1313 916.985.4366 408.275.0565 <br />