Laserfiche WebLink
AS <br />cis Migration Mitigation Agreement 8'-031791 r <br />September 5, 1983 <br />Page 9 <br />made in the reduction of methane gas levels, POS shall cause <br />the CONSULTANT to determine what additional mitigations are <br />necessary to meet said standards pursuant to Articles I9 an0 <br />V. CONSULTANT shall provide to PCS and OWNER an estimate of <br />the cost- of such additional mitigatien noas_u+.es by May 15, 1987. H <br />f PGS is delyyed at: any ti.nu in the installation of <br />the system described in Exhibit C by any ..art or neglect of <br />OWNER or by any employee of OWNER or by any separate contractor A- <br />Y <br />employed by OWNER or by changes ordered in the work by state, <br />federal or local regulations or by labor disputes, fire, <br />unusual delay in transportation, adverse weather conditions not r <br />reasonably anticipatable, unavoidable causes beyond PUS's <br />control or by delay authorized by OWNER or by any other cause <br />which the OWNER and PSS determiner may justify the delay, then <br />the performance standards set forth in Artic:lea IV and V shall <br />be extended for such reasonable, tics as the CONSULTANT may 414 <br />determinn.detetmis,n. <br />7.02 If the cost of, the Mitigation measures nn <br />estirlsted by CONSUL:'AST in accordance with Section 7.01 exceed:. <br />the value of the iota affected by eethan<: gas migratirn ?•t:? ri y <br />elect to purchase those lets for the value specified in Section <br />7.03 below. PCS shall notify OWNERS of its election to <br />purchase a lot or lots within 30 days of CONSULTANT'S estimate <br />but not later than June 15, 1987. PGS shall pay OWNERS the <br />prices) set forth in Section 1.03 on the following terms: <br />415 <br />Ic <br />w'