Laserfiche WebLink
i'•"r)3t79i <br />v 4GasMigrationMitigationAgreement <br />September 5, 1986 <br />Page 7 d <br />ARTICLE V <br />PERFORMANCE SCHEDULE <br />4 <br />i 5.01 PGS shall install or cause to be installed the y <br />2 SYSTEM described in Exhibit C on the schedule attached as <br />i Exhibit D. u•i <br />5.02 if the Standards of Performance required by <br />Article V1 are not met, but no emergency situation is in. <br />existence, PGS shall comply with the following schedule: <br />a) Employ a consultant acceptable to the City to <br />determine necessary additional measures within 30 <br />days of diacovery of violation. <br />iS <br />h) Consultant to report. to CITY, PGS and OWNER within <br />45 days of employment by PCS. <br />c) PGS shall undertake the additional mitigation <br />measures recommended by the consultant in its report <br />1i or required by the City within 30 days, of delivery <br />of the report to CITY. <br />5.03 If at any time the concentrations of methane <br />gas on ORUHRS{ PROPERTY create a safety hazard to people or <br />property, PGS shall immediately take whatever steps are <br />necessary to eliminate the danger and then shell follow the <br />provisions of Section 5.02. <br />Y3. <br />A <br />41, <br />y <br />h r- <br />T