My WebLink
|
Help
|
About
|
Sign Out
RES 221299
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 11:14:47 AM
Creation date
6/22/2022 11:32:12 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton Exhibit I: Cost-Based Rate Adjustment Mechanism <br /> Franchise Agreement with Pleasanton Garbage Service <br /> <br />City of Pleasanton Page I-4 June 7, 2022 <br />Collection vehicle for the then-current Rate Period) x (1 + Annual Percentage <br />Change in the Motor Vehicle Maintenance and Repair Index) x (total number of <br />Collection vehicles in use for services under this Agreement). <br />2. Forecasted Transfer and Transport Cost. Forecasted Transfer and Transport cost <br />= (Transfer and Transport Costs per Ton for the then-current Rate Period) x (1 + <br />Annual Percentage Change in the CPI-U) x (total Tons of Discarded Materials <br />Collected for the most-recently completed 12-month period). <br />3. Forecasted Disposal Cost. The average of the Disposal Cost per Ton (which <br />includes per-Ton Disposal fees, per-Ton environmental fees, and per-Ton <br />government fees) for the then-current Rate Period and the Disposal Cost per Ton <br />for the coming Rate Period is multiplied by the total Tons of Solid Waste Disposed <br />in the most-recently completed 12-month period. <br />4. Forecasted Net Recyclables Processing Cost. Forecasted Net Recyclables <br />Processing cost = (Net Recyclables Processing Costs per Ton for the then-current <br />Rate Period) x (1 + Annual Percentage Change in the CPI-U) x (total Tons of <br />Recyclable Materials Collected for the most-recently completed 12-month <br />period). <br />5. Forecasted Net Organic Materials Processing Cost. Forecasted Net Organic <br />Materials Processing cost = (Net Organic Materials Processing cost per Ton for the <br />then-current Rate Period) x (1 + Annual Percentage Change in the CPI-U) x (total <br />Tons of Organic Materials Collected for the most-recently completed 12-month <br />period). <br />6. Forecasted Net Construction and Demolition Debris Processing Cost. Forecasted <br />Net Construction and Demolition Debris Processing cost = (Net Construction and <br />Demolition Debris Processing cost per Ton for the then-current Rate Period) x (1 <br />+ Annual Percentage Change in the CPI-U) x (total Tons of Construction and <br />Demolition Debris Collected for the most-recently completed 12-month period). <br />7. Interest Expense. Interest Expense is $593,723 for Rate Period Seven. <br />8. Lease Costs. Lease Costs for Rate Period Seven will be determined by by (i) <br />multiplying the allowed Lease costs for most-recently completed Rate Period by <br />one plus the Annual Percentage Change in CPI-U, and (ii) multiplying the result of <br />step one by 1 plus the Annual Percentage Change in CPI-U. <br />9. Landfill Maintenance and Closure Costs. Landfill Maintenance and Closure Costs <br />for Rate Period 7 shall mean the amount to which Contractor is entitled for Rate <br />Period Six pursuant to the terms of the “Agreement Approving an Expenditure of <br />Funds to Close Former Landfill between the City and the Contractor” dated <br />October 7, 1986 and attached as Exhibit O.
The URL can be used to link to this page
Your browser does not support the video tag.