My WebLink
|
Help
|
About
|
Sign Out
20
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
062122
>
20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2022 12:18:19 PM
Creation date
6/21/2022 11:26:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/21/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit .% <br /> Required Services <br /> 1. Coordinate all work Stith Public Art Program <br /> Work closely with the Collections \lanager to develop king range planning and <br /> immediate needs for conscn inw artworks in the Public Art program collection as well as <br /> prioritiic needs and ,goals. Attend meetin,_,s, as needed, to determine scheduling and <br /> oversight olongoing public art projects. <br /> 2. Field Collection 1l.tnagemcnt <br /> Assessment and report of the physical condition of works in the Public Art Collection to <br /> include immediate needs. interim maintenance recommendations and lone range goals for <br /> the preset\ation of the Collection. <br /> • <br /> 3. Additional Service Work <br /> a. Work with Collections Manager. landscape Architect and additional vendors on <br /> installations of new pieces as needed. <br /> h. Maintain physical presence on work sites and good communication e\ith <br /> contractors skilled laborers to assure reasonable time allotments and quality of <br /> service. as needed. <br /> Basic Services <br /> I. Conservation <br /> Review and reline the conservation schedule to reflect contemporarytcJhnietucs tot to m <br /> term and immediate care of public artworks. <br /> 2. Maintenance <br /> a. Review and reline the maintenance schedule for all works in the Public Art <br /> Collection. based on both regular presentative care and situation responses such • <br /> as vandalism. public safety. artwork deterioration, site maintenance, lighting <br /> issues and mechanical considerations affecting presentations. <br /> h. Submit Schedule of Tasks Performed— In collaboration with Collections <br /> Manager. create and deliver an assessment of repairs scheduled and emergency <br /> maintenance and on-going consers ation that has been completed, to include <br /> materials that was used lar projects and approved for reimbursement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.