Laserfiche WebLink
ATTACHMENT 2 <br />JDEDZ Traffic Mitigation Improvements Final Cost Estimate <br />based on low bid received April 29, 2022 <br />JDEDZ Street Improvements Prosect <br />(Mitigation Measures 4.D-1 a, 4.D-1 b, 4.D-3, and 4.D-1 c) <br />Design - Keir and Wright <br />$ 1,215,000 <br />Design — Mark Thomas <br />$ 1,204,890 <br />Right of Way <br />$ 2,581,876 <br />Low Bid Amount (OC Jones) <br />$ 10,595,846 <br />Contingency 10% of Low Bid <br />$ 1,059,585 <br />Construction Support — Keir and Wright <br />$ 70,000 <br />Construction Support — Mark Thomas <br />$ 55,084 <br />Construction Management - Mark Thomas <br />$ 1,689,812 <br />Construction Staking <br />$ 195,736 <br />City Inspection / Plan Check <br />$ 736,356 <br />Cost Control - Cumming <br />$ 48,434 <br />Subtotal <br />$ 19,452,618 <br />Stoneridge Drive and 1-680 Proiect <br />(Mitigation Measure 4.D -1d) <br />Design — Mark Thomas <br />$ 783,975 <br />Right of Way <br />$ 275,612 <br />Low Bid Amount (OC Jones) <br />$ 9,117,824 <br />Contingency 10% of Low Bid <br />$ 911,782 <br />Construction Support — Mark Thomas <br />$ 35,841 <br />Construction Management - Mark Thomas <br />$ 1,099,496 <br />Construction Staking <br />$ 126,227 <br />Special Inspection - Environmental Monitoring <br />$ 174,000 <br />City Inspection / Plan Check <br />$ 479,118 <br />Cost Control - Cumming <br />$ 31,514 <br />Subtotal <br />$ 13,035,389 <br />Grand Total <br />$ 32,488,007 <br />1. Based on low bidder OC Jones per Mark Thomas bid levelling document 5.4.2022 <br />