Laserfiche WebLink
5.05 Dead Plant Material <br /> If large sections of plant material are damaged or destroyed due to vandalism, such <br /> replacement material will be provided or paid for by the City, but shall be installed by the <br /> Contractor as"Extra Work". Documentation such as photos, a cost estimate, and a <br /> Public Safety report for vandalism shall be provided to the City for such plant material. <br /> Receipts for all plant material provided by the Contractor shall be given to the City. <br /> 5.06 Insect and Disease Control <br /> All ornamental plant material will be inspected throughout the year to ensure against <br /> disease and insect infestation. if an infestation occurs, appropriate plant protection shall <br /> be taken. Should a pesticide be required, it shall be applied by a licensed pesticide <br /> applicator by state and local regulations and as weather and environmental conditions <br /> permit. Any pruning necessary to remove infested or infected material is included in this <br /> contract at no additional cost. <br /> A. The Contractor shall have a"Commercial Pest Control Operator's License" as <br /> required by law. <br /> B. The spray materials shall meet all Federal, State and local requirements. <br /> C. The Contractor shall use an insecticide spray that prevents or controls insect <br /> infestations. <br /> D. Application of insect and disease control materials shall be within the time <br /> best suited, according to the manufacturer's specifications and application <br /> rates,for the eradication of the insects and diseases. <br /> E. Any new or existing plants or soil that are damaged by either the lack of a <br /> needed application or the over-application of controlled materials shall be <br /> replaced by the Contractor at his expense. <br /> F. Snails and slugs shall be controlled by the use of an approved non-arsenical <br /> metaldehyde bait as prescribed by a qualified pest control advisor. <br /> 5.07 Watering <br /> All bidders shall submit proposed cool season and warm season watering schedules for <br /> project along with bid documents. <br /> 5.08 Fertilizing <br /> Ground cover and ornamental plants shall be fertilized in agreement with the attached <br /> frequency schedule. Fertilization application will be based on a soils analysis or the <br /> recommendation of the Project Administrator. City staff will be final authority for type <br /> and quantity of fertilizer to be applied. <br /> Exhibit A-Scope of Work 2022 <br /> Rev.4/29/2022 Page 15 <br />