Laserfiche WebLink
3.06 Drainage Systems Maintenance <br /> A. All drainage systems on the properties for purposes of rainwater or irrigation <br /> water collection, whether surface swales, French drains, catch basins, dry <br /> wells, creeks, streams or underground pipes, shall be maintained in a clean <br /> condition free of debris, erosion waste, weeds or any blockage. Natural <br /> creeks and streams are not included. <br /> B. When a drainage system is blocked by debris from off the site or by erosion <br /> waste from off-site major storm damage, correction will be made by the City <br /> after prompt notification by the Contractor or considered "Extra Work"as <br /> approved by the City. <br /> 3.07 Erosion Control <br /> The Contractor shall not be responsible for structural maintenance or repair or <br /> replacement of the following: parking areas, driveways, streets, or sidewalks except for <br /> such structural maintenance, repair or replacement resulting from damage caused by the <br /> Contractor or his agents. <br /> A. Erosion resulting from failure to maintain properly rooted plant material on <br /> slopes shall be the responsibility of the Contractor to correct and accomplish <br /> necessary cleanups. <br /> B. Erosion resulting from major storm damage that requires major slope <br /> reconstruction and/or installation of additional drainage facilities shall be the <br /> City's responsibility. <br /> 3.08 Records <br /> Written records of watering schedules, fertilization, pest control spraying, and other <br /> maintenance work shall be maintained by the Contractor. Written records describing all <br /> products and materials used during maintenance also shall be maintained by the <br /> Contractor. A copy of the record shall be provided to the City on a monthly basis. <br /> 3.09 Control, Supervision and Approval Authority <br /> A. Unless otherwise provided by specific provisions, Contractor's operations and <br /> activities pursuant to this agreement shall be under the control and supervision <br /> of the Director of Engineering or his authorized representative, and such <br /> person shall exercise such control and supervision for and on behalf of the <br /> City where so designated in this agreement. <br /> B. Whenever, under the provisions of this agreement, the Contractor is prohibited <br /> from doing something unless Contractor first obtains the approval or consent <br /> of the City, such approval and consent must be obtained from the Director of <br /> Engineering, or his authorized representative. <br /> 3.10 Pest and Disease Control <br /> Exhibit A-Scope of Work 2022 <br /> Rev.4/29/2022 Page 9 <br />