My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 4:01:10 PM
Creation date
6/2/2022 4:00:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When the project is competitively bid, the City will be able to award the base bid and <br /> also choose to award some or all of the additive bid items as project funding allows. <br /> RRM and City staff will create a phasing strategy as the project design is further <br /> developed and cost estimates are refined. The phasing strategy will focus on retaining <br /> the main master plan components in the base bid —the skateab;e area, skatepark <br /> lighting, and hardscape/improvements essential to the skatepark. Other master plan <br /> components will be additive bid items. The additive bid items may include expansion of <br /> the existing parking lot, a shade structure(s), or possibly some hang-out <br /> areas/furnishings. The phasing strategy will also identify components of the master plan <br /> that will be a part of future project phases. Future phases may include a restroom, <br /> additional hang-out areas/furnishings, and landscape or hardscape improvements. The <br /> goal of the phasing strategy will be to eventually construct the skatepark as envisioned <br /> in the master plan logically so that each phase adds to the end product without requiring <br /> demolition or modification of work in prior phases. <br /> Funding for the Skatepark at Ken Mercer Sports Park Project, CIP No. 20774, totals <br /> $2.4 million which include $400,000 from a prior appropriation and $2 million as <br /> proposed in the FY 2022/23 Mid-Term Budget Update. Expenditures to date for the <br /> conceptual design services are $115,512, which includes, RRM design contract <br /> expenses, advertising, and an arborist report. Total design costs are anticipated to be <br /> $469,562, including $332,081 for an amendment to the agreement with RRM, $16,600 <br /> for the design contingency (approximately 5 percent), and $2,500 for a geotechnical <br /> review. The funding and anticipated project expenditures are detailed in Attachment 1. <br /> Submitted by: Reviewed by: Approved by: <br /> Stephen Kirkpatrick A4ahin Shah Gerry Beaudin <br /> Director of Engineering Interim Director of Finance City Manager <br /> Attachments: <br /> 1. Estimated Funding and Expenditure Summary <br /> 2. First Amendment to Professional Services Agreement with RRM <br /> Page 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.