Laserfiche WebLink
ATTACHMENT 1 <br />4-20-22 04 -Ala 580 PM19.9 <br />PROJECT SPECIFIC MAINTENANCE AGREEMENT <br />WITH CITY OF PLEASANTON <br />THIS AGREEMENT is made effective this day of. .20—, by and between <br />the State of California, acting by and through the Department of Transportation, <br />hereinafter referred to as "STATE" and the City of Pleasanton; hereinafter referred to as <br />"CITY"; and collectively referred to as "PARTIES". <br />SECTION I <br />RECITALS <br />1. Encroachment Permit Number was executed between CITY and STATE <br />on to construct a bike lane facility, soundwall, and <br />landscaping on State Route (SR) 580 at Hopyard Road overcrossing to Owens Drive, <br />hereinafter referred to as "PROJECT", and <br />2. In accordance with said permit, it was agreed by PARTIES that prior to or upon <br />PROJECT completion, CITY and STATE will enter into a Maintenance Agreement, <br />and <br />3. The PARTIES hereto mutually desire to identify the maintenance responsibilities of <br />CITY for the improvements of PROJECT constructed within the STATE right of way <br />under the Encroachment Permit Number , and <br />4. The degree or extent of maintenance work to be performed, and the standards, <br />therefore, shall be in accordance with the provisions of Section 27 of the Streets and <br />Highways Code and the then current edition of the State Maintenance Manual <br />S. There is an existing Freeway Maintenance Agreement(s), with CITY dated August 8, <br />1969. This Agreement is meant to replace the earlier agreement. <br />NOW THEREFORE, IT IS AGREED AS FOLLOWS: <br />61 1: 14 1160 K <br />AGREEMENT <br />1. Exhibit A consists of plan drawings, and delineate and describe the areas within <br />STATE right of way which are the responsibility of the CITY to maintain in accordance <br />with this Agreement. <br />