Laserfiche WebLink
ATTACHMENT 3 <br />TRANSPORTATION CORRIDOR PARKING LOT - Project No. 17448 <br />CONTRACT CHANGE ORDER (CCO) SUMMARY - Updated April 25, 2022 <br />Change Order <br />No <br />Description <br />Requested By <br />PCO S <br />Pdwcost <br />Status <br />1 <br />1.1 Additional survey for storm drain <br />City <br />3111 <br />$1,650.00 <br />Approved <br />1.2 Install storm drain sleeve <br />City <br />14 <br />51,341.24 <br />Approved <br />1.3 Credit for storm drain trench <br />City <br />1 <br />-$7,300.00 <br />Approved <br />1.4 Remove unmarked pier and concrete slab <br />GradeTech <br />7 <br />$2.004.81 <br />Approved <br />1.5 Additional survey and staking for storm drain and wall <br />GradeTech <br />12112 <br />$3,740.00 <br />Approved <br />1.6 Additional survey and staking for storm drain <br />GradeTech <br />13111 <br />$2,777.50 <br />Approved <br />1.7 Additional 3" BSM soil <br />City <br />15 <br />52.344.09 <br />Approved <br />1.8 Place 6" AB under Silva Cells <br />GradeTech <br />16 <br />$14,484.87 <br />Approved <br />1.9 -1.11 Remove concrete blcok/kicker <br />GradeTech <br />17, 18, 19 <br />S8.107.32 <br />Approved <br />CCO 1 Subtotal: <br />$29,149.83 <br />2 <br />2.1 Additional concrete form and concrete for wall <br />City <br />2111 <br />$1,114.45 <br />Approved <br />2.2 Additional rebar for retaining wall <br />GradeTech <br />10111 <br />$1,119.01 <br />Approved <br />CCO 2 Subtotah <br />$2,233.46 <br />3 <br />3.1 Electrical - light fixture increase <br />GTI/Gremelli <br />8rl <br />$1,255.19 <br />Reviewed <br />.3.2 PG&E service conduit extension <br />City <br />34.36 <br />$19,043.40 <br />Reviewed <br />3.3 Addional conduits & utility box at service cabinet <br />GTI/Gremelli <br />21 <br />$1,760.00 <br />In review <br />:3.4 Additional electrical conduit at Bernal <br />City <br />25 <br />$718.66 <br />Reviewed <br />:3.5 Credit for bid item 63 - 4" conduit <br />City <br />Bid item <br />800.00 <br />Reviewed <br />CCO 3 Subtotal: <br />$21,977.25 <br />4 <br />14.1 Landscape and irrigation modifcations per Delta 5 (11-1-21) <br />City <br />37 <br />21900.41 <br />Approved <br />CCO 4 Subtotal: <br />$21,900.41 <br />5 <br />15.1 Relocate construction temporary fence <br />City <br />1181 <br />2 158.62 <br />Approved <br />CCO 5 Subtotal: <br />$2,158.62 <br />6 <br />16.1 Install storm drain sleeve under retaining wall <br />City <br />4 <br />$1,265.68 <br />In Review <br />16.2 Mason time for Abbie St grade review <br />GradeTech <br />22 <br />$294.32 <br />Reviewed <br />16.3 Concrete curb modifications <br />City <br />24 <br />$2,541.00 <br />Reviewed <br />16.4 Trench slurry backfill at Bernal Ave <br />City <br />26 <br />$3,032.21 <br />Reviewed <br />16.5 Pedestrian pavers extra mobilization <br />GTI/European <br />29 <br />$1,650.00 <br />In Review <br />16.6 Prime coat deletion <br />GradeTech <br />30 <br />-$983.69 <br />Reviewed <br />6.7 Demo concrete ramp at STA 6+10 <br />City <br />32r1 <br />$2,765.89 <br />In Review <br />6.8 Relocate water meter & backflow <br />City <br />33r1 <br />$1,329.18 <br />Reviewed <br />15.9 Delete bid item 58, install 1.5" irrigation & meter <br />City <br />Bid item <br />-$5,600.00 <br />Reviewed <br />16.10 Abbie St sidewalk modification <br />City <br />Bid item <br />$3,000.00 <br />Reviewed <br />15.11 Centennial Towers Plaza base modifications <br />City <br />38 <br />-$6,576.69 <br />Reviewed <br />16.12 Main Street pedestrian pavers modifications <br />City <br />Bid item <br />-$1,000.00 <br />Reviewed <br />CCO 6 Subtotal: <br />$1,717.90 <br />7 <br />7.1 Storm drain modifications at 164 Main St <br />City <br />20.3 <br />$8,625.00 <br />Reviewed <br />7.2 Additional rail for wood fence at 252 Main St <br />City <br />27 <br />$862.40 <br />Reviewed <br />7.3 164 & 234 Main St parking lot additional AC <br />City <br />Bid item <br />$16,000.00 <br />Reviewed <br />7.4 260/288 Main St parking lot modifications <br />City <br />Bid item <br />$2,500.00 <br />Reviewed <br />7.5 Ditch modification at 234 Main St <br />City <br />23 <br />$10,000.00 <br />In review <br />7.6 Relocate storm drain behind 234 Main St <br />City <br />35 <br />1472.60 <br />Reviewed <br />CCO 7 Subtotal: <br />$38,460.00 <br />8 <br />113.1 Additional retaining wall architectural treatment <br />City <br />28 <br />$68,255.09 <br />In progress <br />13.2 Additional 280 tons Class II AB per bid item 9 <br />GradeTech <br />RFI 31 <br />Jlla60.00 <br />In progress <br />CCO S Subtotal: <br />$95,415.09 <br />CCO 9 Subtotal: <br />$0.00 <br />Contract Change Order Total To Date: <br />$213,012.56 <br />