My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
051722
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 9:59:24 AM
Creation date
5/11/2022 9:57:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2022
EXPIRATION DATE
5/17/2037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Consultant shall be available within one business day to respond to questions from the City that <br /> may be generated during field inspection for each authorized plan check that is subsequently issued <br /> a permit for construction. <br /> 14. Consultant shall be familiar with and enforce appropriately the City's adopted codes and <br /> amendments. <br /> Plan Review Compensation: <br /> Plan Review Level"A"—65% of Plan Review Fee <br /> Complete structural and nonstructural building and fire/life safety plan review, including CBC,CRC, <br /> CMC, CPC, CEC (California Electrical Code), CFC, California Energy Efficiency Standards, <br /> CALGreen,(California Green Building Code), Stormwater treatment and/or management,and City of <br /> Pleasanton specific regulations and policies,as applicable. <br /> Plan Review Level `B"—55% of Plan Review Fee <br /> Complete nonstructural building plan review including CBC, CRC, CMC, CPC, CEC (California <br /> Electrical Code),CFC,California Energy Efficiency Standards,CALGreen,(California Green Building <br /> Code), Stormwater treatment and/or management, and City of Pleasanton specific regulations and <br /> policies, as applicable. <br /> Plan Review Level"C"—40% of Plan Review Fee <br /> Complete structural building plan review including CBC, CRC and City of Pleasanton specific <br /> regulations and policies,as applicable. <br /> Plan Review Level "D" <br /> $140.00 hourly fee for nonstructural plan review services. <br /> Plan Review Level"E" <br /> $140.00 hourly fee for structural plan review services. <br /> Plan Review Level"F"—30% of Permit Fee <br /> The City of Pleasanton incorporates the plan review into the permit fee for Fire permits. Complete fire <br /> sprinkler,fire alarm,commercial hood or hazardous material plan review of all Fire Permits,including <br /> CFC, and City of Pleasanton and Livermore Pleasanton Fire Department specific regulations and <br /> policies, as applicable. <br /> Hourly Plan Review rate for all reviews$140.00. <br /> Hourly rate for Solar PV $140.00 max for simple systems and up to 20KW. Over 20KW billed hourly <br /> for actual time spent on review. <br /> For residential projects and commercial projects with a$75,000 plan review fee or less, consultant <br /> can bill hourly for reviews that go beyond the 3'submittal to be cost recovery.Projects with a plan <br /> review fee over$75,000,extra hourly fees are not allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.