Laserfiche WebLink
70. EROSION CONTROL MEASURES FOR SUBDIVISIONS: The applicant shall <br /> submit an erosion control plan designed by a certified Qualified SWPPP <br /> (Stormwater Pollution Prevention Plan) Designer or Practitioner (QSD or QSP) <br /> for all projects disturbing 1 acre or more, subject to the review and approval of <br /> the Director of Engineering/City Engineer. All cut and fill slopes shall be <br /> hydromulched/hydroseeded and stabilized immediately after the completion of <br /> grading work and in no case later than October 1, unless otherwise approved by <br /> the Director of Engineering/City Engineer. No grading shall occur between <br /> October 1 and April 30 unless erosion control measures are in place, subject to <br /> the review and approval of the Director of Engineering/City Engineer. Such <br /> measures shall be maintained until the permanent landscaping is completed to <br /> the satisfaction of the Director of Engineering/City Engineer and the Notice of <br /> Termination for the coverage under the Construction General Permit, if <br /> applicable, is approved by the California State Water Resources Board. <br /> (Address this condition prior to improvement plan approval) <br /> 71. CONSTRUCTION PER CITY STANDARDS: All public improvements shall be <br /> constructed in compliance with the City Standard Specifications and Details in <br /> effect at the time of permit issuance. (Address this condition prior to <br /> improvement plan approval) <br /> 72. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor <br /> shall obtain an encroachment and haul route permit from the Engineering <br /> Department prior to moving equipment to the project site or performing work in <br /> the public right of way or within public easements. The applicant's contractor <br /> shall submit a completed and signed encroachment permit application <br /> accompanied with copies of City-approved improvement plans, proof of <br /> insurance with endorsement adding the City as an additional insured, a copy of <br /> a valid City of Pleasanton business license, applicable fees, and other <br /> requirements determined by the Director of Engineering/City Engineer. (Address <br /> this condition prior to encroachment permit issuance) <br /> 73. SANITARY SEWER CONNECTIONS/CLEANOUT: The applicant shall provide <br /> each lot, parcel of land, or building with an independent connection to the public <br /> sanitary sewer main. A sanitary sewer service lateral with a two-way cleanout <br /> shall be installed at the back of the sidewalk or curb, whichever is applicable, at <br /> each lot of record within the development in compliance with the City Standard <br /> Specifications and Details in effect at the time of issuance of permits. (Address <br /> this condition prior to improvement plan approval) <br /> 74. WATER LATERALS AND METERS: The applicant shall provide each lot, <br /> parcel of land, or building with an independent connection to the public water <br /> main and water meter. Meters shall be obtained from the City of Pleasanton <br /> Water Department after paying all applicable fees. Water meter box lids shall <br /> be by Armorcast Products Company or approved equal to accommodate <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 19 of 30 <br />6 Planning Commission <br /> Page 17 of 30 <br />nd the <br /> developers of new homes connecting to these facilities (including the Golf <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 15 of 30 <br />ude that this finding can be made. <br />censed civil engineer, <br /> which include but is not limited to the type, location, and sizing calculations of the <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 16 of 25 <br />d) individuals. <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 3 of 25 <br />