project, depending on timing of construction in each phase. The following items shall be <br /> incorporated into the construction and parking management plan(s): <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, <br /> temporary fencing, construction trailer location, and construction <br /> contractors/workers parking area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction <br /> activities without prior approval by the City. <br /> 36. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br /> project site and as far as possible from existing residences and shall be emptied to <br /> prevent odor. <br /> 37. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off- <br /> hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt <br /> on this site shall occur without specific review and approval by the Director of Community <br /> Development. If stockpiling is allowed, said stockpiles must be covered if rain is forecast. <br /> 38. NOTICE OF CONSTRUCTION: Prior to construction of any project phase, the applicant <br /> shall notify neighbors within 300-feet of the project site of the construction schedule in <br /> writing. Such notice shall include contact names and numbers for property owner, agent <br /> or contractor. If access to any bus stops operated by Livermore Amador Valley Transit <br /> Authority is obstructed, then advance notice shall be sent to the Authority so drivers and <br /> passengers can be alerted. <br /> 39. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance <br /> coordinator" who shall be responsible for responding to any complaints regarding <br /> construction noise, dust, construction parking, etc. The coordinator (who may be an <br /> employee of the general contractor) shall determine the cause of the complaint and shall <br /> require the implementation of reasonable measures warranted to correct the problem. A <br /> telephone number of the disturbance coordinator shall be posted on the construction site <br /> fence and on the notification sent to neighbors adjacent to the site. The sign shall also list <br /> an emergency after-hours contact number for the disturbance coordinator, or designee. <br /> 40. CULTURAL RESOURCES: If any prehistoric or historic artifacts, or other indication of <br /> cultural resources are found once the project construction is underway, all work shall stop <br /> within 20-meters (66 feet) of the find. A qualified archaeologist shall be consulted for an <br /> immediate evaluation of the find prior to resuming groundbreaking construction activities <br /> within 20-meters of the find. If the find is determined to be an important archaeological <br /> resource, the resource shall be either avoided, if feasible, or recovered consistent with <br /> the requirements of the State California Environmental Quality Act (CEQA) Guidelines. In <br /> the event of discovery or recognition of any human remains in any on-site location, there <br /> shall be no further excavation or disturbance of the site or any nearby area reasonably <br /> suspected to overlie adjacent remains until the County coroner has determined, in <br /> accordance with any law concerning investigation of the circumstances, the manner and <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 8 of 25 <br />all only occur between February 15 and April 15, <br /> and from August 15 through October 30, in order to avoid take of non-volant <br /> (non—flying or inactive, either young, or seasonally torpid) individuals. <br /> PUD-114-01M& P20-0995 Planning Commission <br /> Page 3 of 25 <br />