during the construction phase of the project. The construction and parking management <br /> plan shall be subject to review and approval by the City Traffic Engineer and Director of <br /> Community Development prior to issuance of a demolition permit, or the first building <br /> permit, whichever comes first. The following items shall be incorporated into the <br /> construction and parking management plan: <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, <br /> temporary fencing, construction trailer location, and construction <br /> contractors/workers parking area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction activities <br /> without prior approval by the City. <br /> 24. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br /> project site and as far as possible from existing residences and shall be emptied to <br /> prevent odor. <br /> 25. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off- <br /> hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt <br /> on this site shall occur without specific review and approval by the Director of Community <br /> Development. <br /> 26. NOTICE OF CONSTRUCTION: Prior to construction, the applicant shall notify neighbors <br /> within 300-feet of the project site of the construction schedule in writing. Such notice shall <br /> include contact names and numbers for property owner, agent or contractor. <br /> 27. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance <br /> coordinator" who shall be responsible for responding to any complaints regarding <br /> construction noise, dust, construction parking, etc. The coordinator (who may be an <br /> employee of the general contractor) shall determine the cause of the complaint and shall <br /> require the implementation of reasonable measures warranted to correct the problem. A <br /> telephone number of the disturbance coordinator shall be posted on the construction site <br /> fence and on the notification sent to neighbors adjacent to the site. The sign shall also list <br /> an emergency after-hours contact number for the disturbance coordinator, or designee. <br /> 28. CULTURAL RESOURCES: If any prehistoric or historic artifacts, or other indication of <br /> cultural resources are found once the project construction is underway, all work shall stop <br /> within 20-meters (66 feet) of the find. A qualified archaeologist shall be consulted for an <br /> immediate evaluation of the find prior to resuming groundbreaking construction activities <br /> within 20-meters of the find. If the find is determined to be an important archaeological <br /> resource, the resource shall be either avoided, if feasible, or recovered consistent with <br /> the requirements of the State California Environmental Quality Act (CEQA) Guidelines. In <br /> the event of discovery or recognition of any human remains in any on-site location, there <br /> shall be no further excavation or disturbance of the site or any nearby area reasonably <br /> suspected to overlie adjacent remains until the County coroner has determined, in <br /> accordance with any law concerning investigation of the circumstances, the manner and <br /> cause of death and has made recommendations concerning treatment and dispositions <br /> of the human remains to the person responsible for the excavation, or to their authorized <br /> P21-0076& PUD-141 Planning Commission <br /> Page 5 of 16 <br /> cost prior to submittal of the map for the Director of Engineering/City Engineer's <br /> signature. <br /> PUD-140 & P21-0079 Planning Commission <br /> Page 9 of 15 <br />