Laserfiche WebLink
Resolution No. PC-2021-07 <br /> Page Eleven <br /> 21. MECHANICAL EQUIPMENT — SCREENING: The applicant shall effectively screen from <br /> view all ducts, meters, air conditioning equipment, and any other mechanical equipment, <br /> whether on the structure, on the ground, or on the roof, with materials architecturally <br /> compatible with the building. Screening details shall be shown on the plans submitted for <br /> building permit, the adequacy of which shall be determined by the Director of Community <br /> Development. All required screening shall be installed prior to final occupancy. <br /> 22. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained completely <br /> within enclosures constructed with roofs. Containers shall be stored within the enclosures <br /> at all times except when being unloaded. The enclosures shall be sized to accommodate <br /> trash, recycling, and green waste containers in compliance with the Alameda County <br /> Mandatory Recycling Ordinance. The materials and colors of any new enclosures shall <br /> match or be compatible with the primary building on site and the gates shall be metal or <br /> solid wood unless otherwise approved by the Director of Community Development. <br /> Elevation drawings and plan details, including color and material of the enclosures noted, <br /> shall be included in the building permit submittal and shall be subject to the review and <br /> approval of the Director of Community Development prior to building permit issuance. <br /> 23. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br /> current City/Pleasanton Garbage Service recycling and composting programs. <br /> Green Building and Sustainability Measures <br /> 24. GREEN BUILDING — NON-RESIDENTIAL NEW CONSTRUCTION: Prior to building <br /> permit issuance, a list of the green building measures used in the design, covered by this <br /> approval, shall be provided to the Planning Division for review and approval by the <br /> Director of Community Development. The project shall be designed, constructed and <br /> operated to a level of design efficiency equal to a Gold level for all Project buildings, <br /> except the parking structure, using U.S. Green Building Council's "Leadership in Energy <br /> and Environmental Design (LEED)" rating system. The green building measures shall be <br /> shown on the building permit plans submitted to the Building and Safety Division. Each <br /> proposed point identified shall have a notation indicating the sheet(s) the point can be <br /> found. A special inspection by the Planning Division shall be coordinated with regards to <br /> exterior materials. Prior to building permit final, all of the green building measures <br /> indicated on the approved checklist shall be inspected and approved by either the City of <br /> Pleasanton, a third party rater, or the applicant shall provide written verification by the <br /> project engineer, architect, landscape architect, or designer. (Project Specific <br /> Condition) <br />ehensive <br /> sign program submitted to the Planning Division under a separate application. <br /> 13. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the <br /> building permit submittal. The design and location must be approved by the Planning <br /> Division and comply with all setback requirements. <br />erefore, it is recommended the <br /> City Council make this finding. <br />mmunity, and regional commercial <br /> uses to support Pleasanton's increasing business activity. It is recommended the City <br /> Council find the proposed development plan is consistent with the City's General Plan, and <br /> this finding can be made. <br />