Laserfiche WebLink
Measure BB <br /> Bike and Ped <br /> ($1 M) <br /> TFCA($150k) <br /> Street CIP <br /> Library Roof $5M CIP No. 14408 Yes, $3.7M Design Complete May 2022 Reduced <br /> and 21414, Start Construction July 2022 <br /> ($1.3M) Completion of Construction October 2022 <br /> Library $1.25M -$1.5M CIP No. 23493, Yes, up to 35% Design April 4. Reduced <br /> Lighting& Fire $400k $1.1 million Start Construction August,4-5 months of <br /> Control Panel construction. <br /> Budget only replaces panel and existing <br /> annunciators. Additional $250k-$350 to bring <br /> full system to current codes. <br /> Nevada Street $2.5M for CIP No. 20565, Yes, approx. Plans are 65%, 2-3 more months for design, 2-3 Moderate <br /> streetscape construction, approx. $224k $2.6M months for bidding, 10 months for <br /> $300k for design construction <br /> 3 <br />