My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
041222 SPECIAL
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 4:31:52 PM
Creation date
4/7/2022 4:31:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/12/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measure BB <br /> Bike and Ped <br /> ($1 M) <br /> TFCA($150k) <br /> Street CIP <br /> Library Roof $5M CIP No. 14408 Yes, $3.7M Design Complete May 2022 Reduced <br /> and 21414, Start Construction July 2022 <br /> ($1.3M) Completion of Construction October 2022 <br /> Library $1.25M -$1.5M CIP No. 23493, Yes, up to 35% Design April 4. Reduced <br /> Lighting& Fire $400k $1.1 million Start Construction August,4-5 months of <br /> Control Panel construction. <br /> Budget only replaces panel and existing <br /> annunciators. Additional $250k-$350 to bring <br /> full system to current codes. <br /> Nevada Street $2.5M for CIP No. 20565, Yes, approx. Plans are 65%, 2-3 more months for design, 2-3 Moderate <br /> streetscape construction, approx. $224k $2.6M months for bidding, 10 months for <br /> $300k for design construction <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.