My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
031522
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 8:50:08 AM
Creation date
3/10/2022 8:50:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/15/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
year of operational expenses will be included the Mid-term FY 2022/23 Recycled Water <br /> operating budget process. However, should mandatory conservation be in place in <br /> future years, staff will request on-going operational expenses from future budgets. <br /> Tri-Valley residents will purchase a "season pass" for a Program Fee of $100, which <br /> allows users an unlimited amount of recycled water during the Fill Station's operational <br /> period of April through October. Program fee revenues would be used to partially offset <br /> program costs, and would be shared equitably by DSRSD, Livermore, and Pleasanton. <br /> BACKGROUND <br /> In 2014, in response to continuing and worsening drought conditions, all the water <br /> agencies of the Tri-Valley declared a local drought emergency and implemented <br /> mandatory water conservation measures. Most notably, these included a common limit <br /> of no more than two days of outdoor irrigation a week. To provide an alternative for <br /> residents in the City of Pleasanton and DSRSD service area with trees or landscaping <br /> that required more water than the potable limits, DSRSD developed and implemented a <br /> residential recycled water fill station program at the DSRSD Regional Wastewater <br /> Treatment Plant (WWTP) for residential customers. DSRSD's effort was particularly <br /> innovative, requiring special approvals from the State Water Resources Control Board <br /> (SWRCB) to allow the program under the District's existing recycled water permit. The <br /> fill station served as a model for other Bay Area agency fill stations that are currently <br /> operating. <br /> Typically, residential recycled water users would utilize 280-gallon totes to haul recycled <br /> water loads of up to 2,000 pounds. DSRSD's residential fill station was popular with <br /> residents in the Tri-Valley and beyond. The number of permitted customers in 2015 rose <br /> to over 3,600, and the amount of recycled water consumed in the residential fill station <br /> program increased to 28.2 million gallons, representing about 2.7 percent of the <br /> recycled water produced that year. On individual days, the fill station use accounted for <br /> up to 5 percent of the recycled water produced. Customers were not limited to DSRSD's <br /> service area. Interest in the fill station extended throughout the Tri-Valley and as far as <br /> San Bruno, Salida, Pittsburg, Newark, Los Gatos, Foster City, and Alameda. The <br /> distribution of fill station users was: <br /> • Dublin — 17.5% <br /> • San Ramon — 12.5% <br /> • Pleasanton —45% <br /> • Other non-DSRSD customers — 25% <br /> With good precipitation in the early months of 2016, in June 2016 the Agencies <br /> terminated their local drought emergency declaration, and ended mandatory water <br /> conservation measures. <br /> On December 20, 2016, the DSRSD Board reviewed operational and financial options <br /> for the fill station. The DERWA (DSRSD-EBMUD Recycled Water Authority) Recycled <br /> Water Treatment Plant Expansion Project was planned to start in January 2017 and <br /> continued through summer 2018. The project entailed significant construction activity in <br /> and around the WWTP gate area which would create traffic conflicts with residential <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.