My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
031522
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 4:55:40 PM
Creation date
3/9/2022 4:55:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/15/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> THE CITY OF • <br /> _a� �'i:� wwe .am <br /> L£�S�4NTON� CITY COUNCIL AGENDA REPORT <br /> March 15, 2022 <br /> Engineering <br /> TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS, AND AWARD <br /> A CONSTRUCTION CONTRACT TO ROSAS BROTHERS <br /> CONSTRUCTION IN THE AMOUNT OF $589,502 FOR THE ANNUAL <br /> CURB AND GUTTER REPLACEMENTS FOR STREET RESURFACING <br /> PROJECT, CIP NO. 22509 <br /> SUMMARY <br /> This annual project removes and replaces damaged concrete street improvements, <br /> sidewalk, and curb and gutter. The project also includes the installation or modification <br /> of the Americans with Disabilities Act (ADA) pedestrian access ramps where none exist <br /> or where the ramps are significantly out of compliance with current ADA standards. The <br /> project was designed in-house, then competitively bid for construction. Staff <br /> recommends award of the construction contract to the lowest bidder, Rosas Brothers <br /> Construction, in the amount of $589,502. <br /> RECOMMENDATION <br /> 1. Approve the plans and specifications for this project, review the bids received, and <br /> award the construction contract for the project to Rosas Brothers Construction of <br /> Oakland, California, in the amount of$589,502. <br /> 2. Authorize the City Manager to enter into the construction contract with Rosas <br /> Brothers Construction. <br /> 3. Authorize the Director of Engineering to approve and execute contract change <br /> orders for a not-to-exceed contingency amount of$88,425 (approximately 15 <br /> percent of the bid amount). <br /> FINANCIAL STATEMENT <br /> Project funding totals $750,000 with an anticipated total expenditure of $693,406, <br /> including the construction contract for $589,5020, a construction contingency of <br /> $88,425, and $15,479 in miscellaneous expenses, which include advertising, tree <br /> removal and material testing services. The funding and anticipated project expenditures <br /> are detailed in Attachment 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.