Laserfiche WebLink
Ordinance No. 2234 <br />Page 5 of 8 <br />6. Whether adequate public safety measures have been incorporated into the <br />design of the plan: <br />Access to the project site would via Alisal Street and Westbridge Lane. One <br />primary street, Spotorno Ranch Drive, would provide access to the 22 residential <br />lots. Spotorno Ranch Drive includes two 14 feet wide lanes with a 5 -foot wide <br />sidewalk on one side and a 12 -foot wide trail and a 4 -foot wide landscape strip on <br />the opposite side. Emergency access would be provided via Spotorno Ranch <br />Drive. All lots except for Lots 13-15 would access from Spotorno Ranch Drive. Lots <br />12-15 would be accessed off the existing Westbridge Lane. <br />The Livermore -Pleasanton Fire Department has reviewed the proposed street <br />layout. It finds the proposed street and EVA connection are acceptable and can be <br />negotiated by fire and other emergency vehicles. The new homes would be <br />equipped with automatic residential fire sprinklers. The homes would be required <br />to meet the requirements of applicable City codes, and State of California energy <br />and accessibility requirements. <br />Several new trails would be incorporated within and along streets adjacent to the <br />project, providing enhanced opportunities for safe walking and biking for project <br />residents and neighbors. <br />The City Council finds the proposed project is configurated to provide adequate <br />circulation for fire, police, and other emergency vehicles. The new homes will be <br />equipped with automatic residential fire sprinklers. In addition, the Project is <br />conditioned to provide an Open -Space Management and Wildland Fire <br />Management Plans subject for review and approval by the Fire Marshal. <br />Furthermore, the future homes will be required to meet the requirements of <br />applicable City and State codes. As such, the City Council concludes that this <br />finding can be made. <br />7. Whether the plan conforms to the purposes of the PUD District: <br />The primary purpose of the PUD district is to allow flexibility in the development of <br />projects the City determines are in its best interest. The Commission finds the <br />slightly narrower lot width on Lots 2-7 is acceptable. This 5% difference from <br />standard (175 feet required vs 165 feet proposed) would not substantially diminish <br />the semi -rural feel or spacious layout of these one -plus acre lots. Additionally, the <br />overall lot pattern is consistent and logical with wider lots located when a street <br />curves and at street corners. Thus, the proposed site layout and development <br />standards meets the PUD requirements and the HVSP. The City Council finds that <br />the proposed Project conforms to the purposes of the PUD district. Additionally, <br />the City Council finds that proposed setbacks would provide adequate distance <br />between buildings thus would allow ample natural light to each lot and future <br />residence. The Project, as conditioned, would help to implement the purposes of <br />the PUD ordinance by allowing for flexible site standards that meets the City's <br />General Plan and HVSP and results in a development plan that optimizes the use <br />of this site in a reasonably sensitive manner. As such, the City Council concludes <br />that this finding can be made. <br />