Laserfiche WebLink
GHG Reduction Strategies Quantification and Evidence  <br />Page 15  <br />Table 5. Net present value (NPV) net cost estimates for CAP 2.0 action implementation (through 2031).  <br />Sector ID Action NPV Costs to City NPV Costs to Community  <br />B&E P1 All‐electric reach code $49,020  ($2,784,572)  <br />B&E P2 Existing Building Electrification Plan $138,455  $137,032   <br />B&E S1 Refrigerant management in new  <br />construction $42,675  ($262,307)  <br />B&E P3 Modify Municipal Code definition of  <br />covered projects $0  $287,074   <br />B&E S2 Community energy efficiency upgrades $958,041  ($1,959,201)  <br />B&E S3 Energy Benchmarking and City Facility  <br />Retrofits ($3,103,111) $0   <br />B&E E2 Zero emissions energy as default East  <br />Bay Community Energy (EBCE) choice       <br />B&E P4 Solar and storage on new construction $0  $0   <br />T&LU P5 ZEV Infrastructure Plan $217,582  ($31,005)  <br />T&LU P6 Small‐engine and off‐road  <br />equipment electrification ‐ municipal $0  $0   <br />T&LU P7 Small‐engine electrification ‐  <br />community $0  ($2,448,960)  <br />T&LU E3 Bicycle, pedestrian, and trails network  <br />expansion       <br />T&LU P8 Bicycle amenities including required  <br />bike parking at MF/Comm  <br />developments $0  $2,492,542   <br />T&LU P9 Bicycle rack incentive program  $7,562  ($777,244)  <br />T&LU P10 Increase transit ridership  $75,384  ($585,351)  <br />T&LU S4 VMT reduction for K‐12 activities  $571,058  ($6,358,627)  <br />T&LU E6 Housing Element       <br />T&LU P11 Promote LEED Neighborhood  <br />Development  $910  ($849,750)  <br />M&C E10 Textile recovery         <br />M&C P12 Single use plastic reduction $0  $0   <br />M&C S6 Embodied carbon reduction plan  $0  ($88,625)  <br />M&C S5 Environmentally preferable purchasing  <br />policy  $0  $0   <br />NS P13 Urban Forest Master Plan $486,089  $469,585   <br />NS P14 Soil management carbon sequestration  <br />projects $34,711  $2,868,511   <br />NS S7 Carbon sequestration research and  <br />tracking $0  $0   <br />WR P15 Water efficiency programs including  <br />water fixture retrofits $1,634,626  ($4,650,298)  <br />WR S8 Green Stormwater Infrastructure Plan $0  $0   <br />WR E17 On‐site stormwater management       <br />CRW E21 Community gardens       <br />CRW S9 Wildfire preparation, prevention, and  <br />education $0  $0   <br />CRW P16 Comprehensive climate awareness,  <br />education, recognition, and outreach $118,522  $0   <br />    TOTAL $1,231,524 ‐$14,541,197  <br />