Laserfiche WebLink
GHG Reduction Strategies Quantification and Evidence Page 11 Cost City Staff Time The consultant examined anticipated City staff resources required for CAP implementation, detailed by action below. City staff time are presented in full‐time equivalencies (FTE). City staff FTE are a required City resource—the FTE requirements may become part of existing staff duties and assigned to various divisions, or new staff may be required. Sector ID Action 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total B&E P1 All‐electric reach code 0.00 0.00                 0.00 B&E P2 Existing Building Electrification Plan         0.00 0.00 0.00 0.00 0.00 0.00 0.00 B&E S1 Refrigerant management in new construction                0.00 0.00 0.00 0.00 B&E P3 Modify Municipal Code definition of covered projects 0.02                   0.02 B&E S2 Community energy efficiency upgrades       0.25 0.10 0.10 0.10 0.10 0.10 0.10 0.85 B&E S3 Energy Benchmarking and City Facility Retrofits 0.25 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.97 B&E E2 Zero emissions energy as default East Bay Community Energy (EBCE) choice                     0.00 B&E P4 Solar and storage on new construction 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.11 T&LU P5 ZEV Infrastructure Plan     1.00 0.50 0.50 0.50 0.50 0.50 0.50 0.50 4.50 T&LU P6 Small‐engine and off‐road equipment electrification ‐ municipal       0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.35 T&LU P7 Small‐engine electrification ‐ community 0.05 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.23 T&LU E3 Bicycle, pedestrian, and trails network expansion                      0.00 T&LU P8 Bicycle amenities including required bike parking at MF/Comm developments 0.02                   0.02 T&LU P9 Bicycle rack incentive program          0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.07 T&LU P10 Increase transit ridership                       0.59 0.59 0.59 1.76 T&LU S4 VMT reduction for K‐12 activities  0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50      4.00 T&LU E6 Housing Element                      0.00 T&LU P11 Promote LEED Neighborhood Development                      0.02 0.01 0.01 0.04 M&C E10 Textile recovery     0.01                 0.01 M&C P12 Single use plastic reduction 0.07 0.07 0.07 0.07             0.27 M&C S6 Embodied carbon reduction plan                       0.05 0.08 0.08 0.21 M&C S5 Environmentally preferable purchasing policy  0.02                   0.02 NS P13 Urban Forest Master Plan 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4.00 NS P14 Soil management carbon sequestration projects 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.50