My WebLink
|
Help
|
About
|
Sign Out
RES 221271
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 2:56:45 PM
Creation date
3/1/2022 2:32:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GHG Reduction Strategies Quantification and Evidence Page 11 Cost City Staff Time The consultant examined anticipated City staff resources required for CAP implementation, detailed by action below. City staff time are presented in full‐time equivalencies (FTE). City staff FTE are a required City resource—the FTE requirements may become part of existing staff duties and assigned to various divisions, or new staff may be required. Sector ID Action 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total B&E P1 All‐electric reach code 0.00 0.00 0.00 B&E P2 Existing Building Electrification Plan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 B&E S1 Refrigerant management in new construction 0.00 0.00 0.00 0.00 B&E P3 Modify Municipal Code definition of covered projects 0.02 0.02 B&E S2 Community energy efficiency upgrades 0.25 0.10 0.10 0.10 0.10 0.10 0.10 0.85 B&E S3 Energy Benchmarking and City Facility Retrofits 0.25 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.97 B&E E2 Zero emissions energy as default East Bay Community Energy (EBCE) choice 0.00 B&E P4 Solar and storage on new construction 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.11 T&LU P5 ZEV Infrastructure Plan 1.00 0.50 0.50 0.50 0.50 0.50 0.50 0.50 4.50 T&LU P6 Small‐engine and off‐road equipment electrification ‐ municipal 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.35 T&LU P7 Small‐engine electrification ‐ community 0.05 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.23 T&LU E3 Bicycle, pedestrian, and trails network expansion 0.00 T&LU P8 Bicycle amenities including required bike parking at MF/Comm developments 0.02 0.02 T&LU P9 Bicycle rack incentive program 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.07 T&LU P10 Increase transit ridership 0.59 0.59 0.59 1.76 T&LU S4 VMT reduction for K‐12 activities 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 4.00 T&LU E6 Housing Element 0.00 T&LU P11 Promote LEED Neighborhood Development 0.02 0.01 0.01 0.04 M&C E10 Textile recovery 0.01 0.01 M&C P12 Single use plastic reduction 0.07 0.07 0.07 0.07 0.27 M&C S6 Embodied carbon reduction plan 0.05 0.08 0.08 0.21 M&C S5 Environmentally preferable purchasing policy 0.02 0.02 NS P13 Urban Forest Master Plan 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4.00 NS P14 Soil management carbon sequestration projects 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.50
The URL can be used to link to this page
Your browser does not support the video tag.