My WebLink
|
Help
|
About
|
Sign Out
RES 221271
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 2:56:45 PM
Creation date
3/1/2022 2:32:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4. Implementation | 65Pleasanton Climate Action Plan 2.0 <br />Table 7. Implementation plan for existing ongoing and primary actions <br />Action <br />City <br />(Costs) or <br />+Savings <br />Community <br />(Costs) or <br />*Savings Phase Staff Time Responsible Department <br />Buildings & Energy <br />P1. All-electric reach code for new construction $49k ($2.7M)I Community Development <br />P2. Existing Building Electrification Plan $138k $137k II Community Development <br />P3. Modify Municipal Code definition of “covered projects” ($0) $287k I Community Development <br />P4. Solar and storage on new construction ($0)($0)I Community Development <br />Transportation & Land Use <br />P5. ZEV Infrastructure Plan $218k ($31k)II Community Development, Operations Services, City <br />Manager’s Office <br />P6. Electrify municipal small engine equipment and reduce <br />emissions of off-road equipment upon replacement <br />($0)($0)II Operations Services <br />P7. Expand community small-engine electrification ($0) ($2.4M)I Community Development & City Manager’s Office <br />P8. Bicycle amenities ($0) $2.4M I Community Development <br />P9. Bicycle rack incentive program $8k ($777k)II Community Development & Economic Development <br />P10. Increase transit ridership $75k ($585k)III Community Development <br />P11. Promote LEED Neighborhood Development $1k ($850k)I Community Development <br />Materials & Consumption <br />P12. Single use plastic reduction ($0)($0)II City Manager's Office <br />Natural Systems <br />P13. Urban Forest Master Plan $486k $470k I Operations Services and Engineering <br />P14. Soil management carbon sequestration projects $35k $2.8M I Operations Services <br />Water Resources <br />P15. Water efficiency and retrofits $1.6M ($4.6M)II Operations Services <br />Community Resilience & Wellbeing <br />P16. Comprehensive climate awareness, education, outreach $119k ($0)I All departments <br />KEY P = Primary action S = Secondary action I = 2022-24 II = 2025-28 III = 2029-31 = Less than 0.5 FTE = 0.5 to 1.0 FTE = More than 1 FTE
The URL can be used to link to this page
Your browser does not support the video tag.