My WebLink
|
Help
|
About
|
Sign Out
RES 221272
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2022
>
RES 221272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 2:22:35 PM
Creation date
3/1/2022 2:21:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. EXPIRATION — RESIDENTIAL PUD: The PUD development plan shall lapse two <br />years from the effective date of this ordinance unless a final or parcel map, as <br />applicable, is approved. If a final or parcel map is approved, the PUD <br />development plan approval shall lapse when the final or parcel map approval <br />expires. If the map is recorded before the final or parcel map expires, then the <br />PUD development approval shall not lapse. <br />3. CONDITIONS OF APPROVAL CHECKLIST: The applicant shall submit a <br />"Conditions of Approval Checklist" indicating all conditions in Exhibit A have been <br />satisfied, incorporated into the building permit plans or improvements plans, <br />and/or addressed. Said checklist shall be incorporated as one of the first four <br />plan sheets of all building permit and engineering permit plan submittals for <br />review by the City prior to issuance of permits. <br />4. PUD PERIOD: The building permit submittal will only be accepted after the <br />ordinance approving the Planned Unit Development (PUD) development plan <br />becomes effective, unless the applicant submits a signed statement <br />acknowledging the plan check fees may be forfeited in the event the ordinance is <br />overturned. In no case will a building permit be issued prior to the PUD ordinance <br />being in effect. <br />5. LIABILITY AND INDEMNIFICATION: To the extent permitted by law, the project <br />applicant shall hold harmless, defend (with counsel acceptable to the City), and <br />indemnify the City, its City Council, its officers, commissions, employee and <br />agents from and against any claim, action, or proceeding brought by a third party <br />against the indemnified parties and/or the applicant to attack, set aside, or void <br />the approval of the project or any permit authorized hereby for the project, <br />including without limitation, reimbursing the City its attorneys' fees and costs <br />incurred in defense of the litigation. The City may, in its sole discretion, elect to <br />defend any such action with attorneys of its choice. <br />PLANNING DIVISION — 925-931-5600 <br />Site Development and Building Design <br />6. DEVELOPMENT STANDARDS: Primary and secondary structures and uses on <br />Parcels A (Martin Ave.) and B (3707 Trenery Dr.) shall be those of the R-1- <br />20,000 District of the Pleasanton Municipal Code. Project specific condition. <br />7. ACCESSORY STRUCTURE: The plans submitted to the Building and Safety <br />Division for plan check and permit issuance for Parcel A (Martin Ave.) shall <br />include all four elevation drawings and a floor plan of the shed. The plans shall <br />be subject to the review and approval of the Planning Division prior to issuance <br />of permits. Project specific condition. <br />8. GARAGE: Garages shall not be modified or used for storage in a manner that <br />would interfere with the ability to park cars within the garages and each resident <br />shall utilize the garages for parking of vehicles only. Project specific condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.