Laserfiche WebLink
Landscape Architect prior to building permit issuance. The Landscape <br />Documentation Package shall include: <br />a. Project Information; <br />b. Water Efficient Landscape Worksheet; <br />C. Soil management report; <br />d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br />64. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to <br />final inspection by the Building and Safety Division, the applicant's landscape <br />architect shall submit a Certificate of Completion Package in PDF format to the <br />Landscape Architecture Division for review and approval. The Certificate of <br />Completion Package shall include: <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation <br />package; <br />C. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br />65. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping <br />shall be installed as shown on the approved building permit set and shall be <br />inspected and approved by the Landscape Architecture Division. <br />66. CONCRETE CURBS: 6 -inch vertical concrete curbs, with curb cuts or flush curbs <br />with wheel stops, if determined to be acceptable by the Director of <br />Engineering/City Engineer and Director of Community Development, shall be <br />installed between all paved and landscape areas, in conformance with the City's <br />Standard Specifications and Details. <br />67. EROSION CONTROL: For purposes of erosion control, the applicant shall plant <br />a hydro seed mixture designed by the applicant's landscape architect and <br />approved by the Landscape Architecture Division prior to installation. The erosion <br />control shall be maintained by the applicant until permanent landscaping is in <br />place. <br />68. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention <br />devices and above ground irrigation controls shall be located and screened to <br />minimize their visual impacts. These devices with their proposed screening shall <br />be shown on the landscaping and utility plans submitted with the building permit <br />plans or improvement plans and shall be subject to the review and approval of <br />the City Landscape Architect prior to their installation. If above -ground, they shall <br />be painted forest green or an equivalent dark -green color. Screens shall consist <br />of berms, walls, or landscaping satisfactorily integrated into the landscape plan. <br />Landscape screens shall include shrubbery designed by species and planting <br />density to establish a complete screen within 1 year from the date of planting. <br />