Laserfiche WebLink
Ordinance No. 2234 <br /> Page 5 of 8 <br /> sensitive to the existing landscape. The design guidelines would require future <br /> homes to be constructed compatible with the existing neighborhood. As such, the <br /> City Council concludes that this finding can be made. <br /> 6. Whether adequate public safety measures have been incorporated into the <br /> design of the plan: <br /> Access to the project site would via Alisal Street and Westbridge Lane. One <br /> primary street, Spotorno Ranch Drive, would provide access to the 22 residential <br /> lots. Spotorno Ranch Drive includes two 14 feet wide lanes with a 5-foot wide <br /> sidewalk on one side and a 12-foot wide trail and a 4-foot wide landscape strip on <br /> the opposite side. Emergency access would be provided via Spotorno Ranch <br /> Drive.All lots except for Lots 13-15 would access from Spotorno Ranch Drive. Lots <br /> 12-15 would be accessed off the existing Westbridge Lane. <br /> The Livermore-Pleasanton Fire Department has reviewed the proposed street <br /> layout. It finds the proposed street and EVA connection are acceptable and can be <br /> negotiated by fire and other emergency vehicles. The new homes would be <br /> equipped with automatic residential fire sprinklers. The homes would be required <br /> to meet the requirements of applicable City codes, and State of California energy <br /> and accessibility requirements. <br /> Several new trails would be incorporated within and along streets adjacent to the <br /> project, providing enhanced opportunities for safe walking and biking for project <br /> residents and neighbors. <br /> The City Council finds the proposed project is configurated to provide adequate <br /> circulation for fire, police, and other emergency vehicles. The new homes will be <br /> equipped with automatic residential fire sprinklers. In addition, the Project is <br /> conditioned to provide an Open-Space Management and Wildland Fire <br /> Management Plans subject for review and approval by the Fire Marshal. <br /> Furthermore, the future homes will be required to meet the requirements of <br /> applicable City and State codes. As such, the City Council concludes that this <br /> finding can be made. <br /> 7. Whether the plan conforms to the purposes of the PUD District: <br /> The primary purpose of the PUD district is to allow flexibility in the development of <br /> projects the City determines are in its best interest. The Commission finds the <br /> slightly narrower lot width on Lots 2-7 is acceptable. This 5% difference from <br /> standard (175 feet required vs 165 feet proposed)would not substantially diminish <br /> the semi-rural feel or spacious layout of these one-plus acre lots. Additionally, the <br /> overall lot pattern is consistent and logical with wider lots located when a street <br /> curves and at street corners. Thus, the proposed site layout and development <br /> standards meets the PUD requirements and the HVSP. The City Council finds that <br /> the proposed Project conforms to the purposes of the PUD district. Additionally, <br /> the City Council finds that proposed setbacks would provide adequate distance <br /> between buildings thus would allow ample natural light to each lot and future <br /> residence. The Project, as conditioned, would help to implement the purposes of <br /> the PUD ordinance by allowing for flexible site standards that meets the City's <br /> General Plan and HVSP and results in a development plan that optimizes the use <br />