My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
030122
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 9:01:28 AM
Creation date
2/24/2022 9:01:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
121. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br /> submitted to the City Traffic Engineer for review and approval. Best <br /> management practices to minimize traffic impacts shall be used during <br /> construction, including scheduling of major truck trips and deliveries, to avoid <br /> peak travel hours. The TCP shall have proper lane closure procedures such as <br /> flagger stations, signage, cones, and other warning devices implemented during <br /> construction. The TCP shall also include time of day/hours of lane closures and <br /> total number of days. (PROJECT SPECIFIC CONDITION) <br /> 122. TRUCK ROUTES: The haul route for all materials to and from the project site <br /> shall be reviewed and approved by the City Traffic Engineer prior to building <br /> permit issuance and shall include the provision to monitor the street surfaces <br /> used for the haul route so that any damage and debris attributable to the haul <br /> trucks is identified and corrected at the expense of the applicant. <br /> [end] <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 30 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.