My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
030122
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 8:59:12 AM
Creation date
2/24/2022 8:59:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the applicant shall provide written verification by the project engineer, architect, <br /> landscape architect, or designer. (Per PMC 17.50) <br /> Construction Practices and Noticing <br /> 21. WORK HOURS: All demolition and construction activities, inspections, plan <br /> checking, material delivery, staff assignment or coordination, etc., shall be limited <br /> to the hours of 8 a.m. to 5 p.m., Monday through Friday. No construction shall be <br /> allowed on State or Federal Holidays or Sundays. The Director of Community <br /> Development may allow earlier "start times" or later "stop times" for specific <br /> construction activities, e.g., concrete pouring. All construction equipment shall <br /> meet Department of Motor Vehicles (DMV) noise standards and shall be <br /> equipped with muffling devices. Prior to construction, the hours of construction <br /> shall be posted on site. <br /> 22. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other <br /> similar vehicle are not allowed on the construction site except when needed as <br /> sleeping quarters for a security guard subject to receipt of a temporary <br /> conditional use permit (per PMC 18.116.010.E). <br /> 23. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be <br /> placed on the project site for daily administration/coordination purposes during <br /> the construction period. <br /> 24. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall <br /> prepare a construction and parking management plan to address impacts and <br /> parking demands during the construction phase of the project. The construction <br /> and parking management plan shall be subject to review and approval by the <br /> City Traffic Engineer and Director of Community Development prior to issuance <br /> of a demolition permit, or the first building permit, whichever comes first. The <br /> following items shall be incorporated into the construction and parking <br /> management plan: <br /> a. Show truck route for construction and delivery trucks that does not <br /> include neighborhood residential streets, unless approved by the City <br /> Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials <br /> storage, temporary fencing, construction trailer location, and <br /> construction contractors/workers parking area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site <br /> construction activities without prior approval by the City. <br /> 25. PORTABLE TOILETS: Portable toilets used during construction shall be kept on <br /> the project site and as far as possible from existing residences and shall be <br /> emptied to prevent odor. <br /> 26. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be <br /> off-hauled from the site and disposed of in a lawful manner. No temporary <br />
The URL can be used to link to this page
Your browser does not support the video tag.