Laserfiche WebLink
Weather protection devices, such as measures to protect pipes from freezing, <br /> shall require approval by the City Landscape Architect prior to use; at no time <br /> shall fabric or other material not designed and/or intended for this purpose be <br /> wrapped around or otherwise placed on these devices. Project specific <br /> condition. <br /> 69. MAINTENANCE: The applicant and all future owners of the property shall, at no <br /> expense to the City, maintain all the landscaped areas related to the project in a <br /> healthful, attractive and reasonably weed-free manner consistent with the <br /> approved landscape plan, for the duration of the existence of the project. <br /> 70. SITE LIGHTING: All site lighting shall be designed for consistency with the <br /> International Dark-Sky Association's (IDA) Model Lighting Ordinance. This <br /> project site shall be considered to be in an LZ-1 zone for design purposes. <br /> Lighting shall be subject to review and approval by the City Landscape Architect <br /> prior to building permit issuance. Project specific condition. <br /> Trees <br /> 71 . TREE REPORT: The applicant shall provide a tree report. Recommendations <br /> made in the report should be printed on the grading, civil and landscape plans. <br /> No tree trimming or pruning other than that specified in the tree report shall <br /> occur. The applicant shall arrange for the Project Arborist to conduct a field <br /> inspection prior to building permit issuance to ensure all recommendations have <br /> been properly implemented. The Project Arborist shall certify in writing all <br /> recommendations have been followed. Project specific condition. <br /> 72. TREE REMOVAL MITIGATION: Any trees approved to be removed by the City <br /> shall have its full value paid into the City's Urban Forestry Fund. A credit for <br /> replanting trees shall be as follows: <br /> a. $250 credit for a 15-gallon size replacement tree; <br /> b. $500 credit for a 24-inch box size replacement tree; and <br /> c. $1 ,000 credit for a 36-inch box size replacement tree. Project specific <br /> condition. <br /> 73. TREE BOND: Any tree affected by development/construction must be protected <br /> per the Municipal Code. The applicant shall post cash, letter of credit, or other <br /> security satisfactory to the Director of Engineering/City Engineer, for all Heritage <br /> Trees and any other significant tree as deemed by the City Landscape Architect. <br /> This bond or security will be for the value of the tree(s), up to a maximum of <br /> $100,000, and shall be held for a minimum of 1 year following acceptance of <br /> public improvements or completion of construction, whichever is later, and shall <br /> be forfeited if the trees are destroyed or substantially damaged. An arborist shall <br /> be onsite during any tree work (i.e. root pruning, trimming, setting up tree <br /> protection. etc.). The bond or security may be released early with a certification <br /> letter by the arborist confirming he/she was present during said tree work and <br /> work was performed in accordance with the arborist's recommendations. <br />