Laserfiche WebLink
Initial Study <br />Table 2 Pleasanton CAP 2.0 Strategies and Actions <br />L•t�I1C1i";jX EIL:� C�3f=�' <br />Strategy BE -1: Advance the decarbonization of buildings <br />P1 All -electric reach code for new construction: Adopt all -electric reach code that <br />2030: 2,628 <br />limits the development of new gas infrastructure by requiring electrification for <br />2045: 22,959 <br />new construction (exceptions will be considered). <br />P2 Existing building electrification plan: Prepare and implement an existing building <br />2030: 4,357 <br />electrification plan including grid analysis, municipal building electrification, <br />2045: 6,034 <br />encouraging community electrification through incentives and permit <br />streamlining, conducting outreach and education, and staying apprised of <br />regulations, studies, and regional efforts. <br />S1 Refrigerant management in new construction: Require new construction use <br />Secondary 1 <br />lowest global warming potential refrigerants for appliances and HVAC systems. <br />Strategy BE -Z: Improve energy consumption and efficiency <br />P3 Modify Municipal Code definition of "covered projects": Modify definition of <br />2030:279 <br />"covered project" in the Pleasanton Municipal Code (PMC) Green Building section <br />2045: 65 <br />to cover all new commercial buildings and residential homes. <br />S2 Community energy efficiency upgrades: Promote community energy efficiency <br />Secondary <br />upgrades through incentives, partnerships, and/or education and outreach, <br />consistent with Action P16. <br />S3 Energy benchmarking and City facility retrofits: Conduct energy benchmarking to <br />Secondary <br />measure and track energy and water usage across City facilities. Identify <br />opportunities for efficiency upgrades and cost savings across City facilities, and <br />conduct energy retrofits of existing City facilities and equipment. The City will <br />work with regional partners to install solar and storage systems on municipal <br />facilities where they will be the most effective. <br />Strategy BE -3: Expand use of renewable energy <br />P4 Solar and storage on new construction: Require solar/battery storage systems on <br />2030:726 <br />new developments to meet the power needs ofthe new development, if feasible. <br />2045:0 <br />Transportation and Land Use <br />Strategy TLU-1: Advance vehicle decarbonization <br />P5 Create and implement a Zero -Emissions Vehicle (ZEV) Infrastructure Plan: <br />2030: 25,352 <br />Develop and implement a ZEV Infrastructure Plan including a fuel infrastructure <br />2045: 71,168 <br />analysis, expand public electric vehicle (EV) infrastructure, incentivize EV, electric <br />bicycle, and ZEV use, require new multi -family housing to install EV charging, <br />transition the municipal fleet to all -electric, conduct education and outreach, and <br />support regional efforts. <br />Final Initial Study — Negative Declaration <br />15 <br />