My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
020122
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:15:50 PM
Creation date
1/26/2022 3:15:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> THE CITY OF <br /> • <br /> _ m-7-6-1 CITY COUNCIL AGENDA REPORT <br /> pLEASANTON. <br /> February 1, 2022 <br /> Engineering <br /> TITLE: APPROVE AN AMENDMENT TO THE TASK AUTHORIZATION WITH <br /> PAKPOUR CONSULTING GROUP IN THE AMOUNT OF $36,915 TO <br /> COMPLETE THE DESIGN AND PREPARE BIDDABLE CONSTRUCTION <br /> DOCUMENTS FOR THE VAL VISTA UNDERDRAIN IMPROVEMENTS <br /> PROJECT, CIP NO. 21457 <br /> SUMMARY <br /> On July 14, 2021, City staff authorized a task authorization in the amount of$74,480 <br /> under the on-call agreement with Pakpour Consulting Group (Pakpour) to provide <br /> design services to modify the existing Val Vista Park underdrain system to connect it <br /> directly to the sanitary sewer system, as well as prepare plans to repair two existing <br /> storm drains serving the park area. During the design, the planned scope of work has <br /> increased, necessitating the need for an amendment for additional design services. The <br /> additional need involves incorporating a pre-packaged pump station into the project, as <br /> well as designing the repair of two more storm drain outfalls. The pre-packaged pump <br /> station will increase the reliability of the system and reduce the staff time necessary to <br /> operate and maintain the modified underdrain system. The necessity of repairs to the <br /> storm drain outfalls was identified during the design process. City staff recommends <br /> approval of an amendment to the task authorization with Pakpour Consulting Group to <br /> complete the design and prepare biddable construction documents for the not-to- <br /> exceed amount of$36,915, increasing the total design cost from $74,480 to $111,395. <br /> The original agreement was approved at a staff level, but since the amendment takes <br /> the total agreement amount above the $100,000 staff has the authority to approve, the <br /> amendment is being presented to City Council with a recommendation for approval. <br /> RECOMMENDATION <br /> 1. Approve an amendment to the task authorization with Pakpour Consulting Group in <br /> the not-to-exceed amount of $36,915 to complete the design and prepare biddable <br /> construction documents, increasing the total task authorization amount from <br /> $74,480 to $111,395. <br /> 2. Authorize the City Manager to execute the amendment to the task authorization. <br /> FINANCIAL STATEMENT <br /> The current Capital Improvement Program budget includes $1.6 million to fund the <br /> design and construction of the Val Vista Underdrain Improvements Project, CIP No. <br /> 21457. <br />
The URL can be used to link to this page
Your browser does not support the video tag.