DISCUSSION <br /> Funding for this project totaled $853,078 for the Annual Playground Renovations <br /> Project, CIP No. 21745. <br /> Construction began in May 2021 and was completed in August 2021. One change <br /> order, totaling $2,000, was issued for work at Vintage Hills Park to install an additional 6 <br /> inches of sand in the existing sandbox. Two change orders totaling $14,525 were <br /> issued for Tawny Park. The first Tawny Park change order of$3,291 was to replace the <br /> existing fabric beneath the engineered wood fiber. The second Tawny Park change <br /> order of$11,234.36 was to extend the footings for the playground equipment to go <br /> beyond the twelve inches of sand discovered beneath the existing engineered wood <br /> fiber. <br /> Upon completion of construction, there was some remaining construction contingency to <br /> provide shade for the Ken Mercer eastern playground as requested during the public <br /> outreach so a final change order, totaling $30,975.55, for Ken Mercer eastern was <br /> issued to provide shade sails for the playground. The shade sails were fabricated <br /> between August-December 2021 and installed at the end of December. <br /> Expenditures totaled $676,587, including advertisement, design, and construction. The <br /> project was completed on schedule. Staff recommends transferring the remaining <br /> balance of$176,491 to use for this fiscal year's Annual Playground Renovations, <br /> CIP No. 22745. <br /> All the work has been completed to the satisfaction of the Director of Engineering. Staff <br /> recommends that the project be accepted by City Council as complete. <br /> Submitted by: Fiscal eview: Approv by: <br /> (10 <br /> Stephen Kirkpatrick Tina Olson Brian Dolan <br /> Director of E 'gineering Director of Finance Interim City Manager <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 4 of 4 <br />