My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENTS 5-7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
011822
>
12 ATTACHMENTS 5-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:57:52 AM
Creation date
1/13/2022 10:49:37 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/18/2022
DESTRUCT DATE
15Y
Document Relationships
12
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\011822
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />"3. The proposed USL mixed use project includes industrial, neighborhood serving <br />retail, a potential school site, and development of a variety of unit types at various <br />densities..." <br />The combined amount of housing currently proposed for Kiewit/SteelWave is 390 Low <br />and Very Low Income units (by density), and 1531 Above Moderate Income (by density) <br />market rate units. For comparison, the EPSP Preferred Alternative had 375 VLI/LI (by <br />density) and 1759 AMI market rate units. <br />To attain economic feasibility, the Preferred Alternative also required 91,000 sq. ft of <br />retail, 442,000 sq. ft. of office, and 1,057,000 sq. ft. of industrial development! The GHG <br />staggering tonnage of emissions generated by the necessary commercial development <br />cannot be mitigated due to the in commute VLI and LI employees. Also keep in mind <br />that, unless all the HDR units consist of non profit housing, less than 40 units will likely be <br />affordable to those making less than 60% AMI. <br />"4. The USL Parcels offer mixed use internalized development of housing, neighborhood <br />retail, industrial, parks and recreational lake, offering an environment where <br />residents will be able to live, work, play, and shop in one convenient location." <br />This description of SteelWave's development as a live work paradise assumes that <br />Pleasanton's commissioners and councilmembers have not reviewed the Census data that <br />shows only 5% of our residents who can afford homes in Pleasanton are employed here. It <br />also does not take into account the majority of jobs in Pleasanton pay at the Low and Very <br />Low income level (below 70% AMI). Therefore, the proposed mix of housing combined <br />with the commercial development needed for financial feasibility will only serve to put the <br />CAP 2.0's goal of net neutrality by 2045 completely out of reach. <br />I have included EPSP materials from 2013 for background information. It includes my <br />analysis of affordable housing demand (easily translated into GHG commute emissions) <br />generated by all the EPSP Alternatives. Please call if you have any questions. <br />In sum, I urge the Commission to recommend HDR infill solutions for AMI housing. We <br />currently do not offer this ownership housing option for our higher income commuting <br />professionals. It would benefit those who do not have the time or desire to maintain a <br />private yard and appreciate the convenience of BART and high end retail. It will also help <br />to challenge the prevailing cultural bias that only the "less fortunate" live in high density <br />housing. <br />Thanks for your consideration. <br />Sincerely, 3 ATTACHMENTS <br />Becky Dennis <br />
The URL can be used to link to this page
Your browser does not support the video tag.