My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:53:16 PM
Creation date
12/15/2021 3:30:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
043535 <br />modification to Exhibits A and & to the Agreement) to include <br />within the definition of the "Property" that portion of the <br />Shopping Center being so developed. Such modification shall be <br />by way of implementation of the terms and conditions of this <br />Amendment and may be completed by City staff without further <br />public hearings. <br />2. Section 2.2 is hereby amended and restated as <br />follows: <br />2.2 Tom. The term of this Agreement and Developer's <br />rights and obligations hereunder shall terminate on December <br />31, 2012. <br />3. Traffic Mitigatign 1mpr!2vpMMts.Sections 3.2(a) <br />and 3.2(b) of the Agreement are hereby amended and restated to <br />read as follows (with Sections 3.2(c) through (e) being <br />redesignated as Sections 3.2(i) through (k), respectively): <br />3.2 Co 'tions. <br />(a) Traffic Mitigation ImDrovements: Estimated Cos <br />In consideration of the City's entering into this Agreement, <br />Developer agrees to contribute to the cost of those public <br />improvements (the "Traffic Mitigation Improvements") set out <br />in Exhibit D attached hereto. The City has identified these <br />Traffic Mitigation Improvements as necessary to maintain <br />adequate levels of service for traffic circulation in and <br />around the Stoneridge Shopping Center area of North <br />Pleasanton as development occurs on certain properties which <br />currently are undeveloped or on other properties which are <br />developed but may be redeveloped or the uses thereon <br />expanded or intensified. The City shall complete the <br />Traffic Mitigation Improvements from time to time as and <br />when the same shall be required, as a consequence of <br />additional development in the Stoneridge Shopping Center <br />area, in order to avoid a deterioration of the level of <br />traffic services (LOS) at any intersection identified on <br />Exhiblt D below LOS "D". As shown on Exhibit O, the <br />estimated costs of constructing the Traffic Mitigation <br />Improvements ("Estimated Traffic Mitigation Improvements <br />Costs"), based on present construction costs, is $1,080,000. <br />Certain funding sources ("Existing Funding Sources") exist, <br />a list of which is set forth in Exhibit E attached. All <br />funds from time to time held by the City from the Existing <br />Funding Sources (or hereafter from a Contributing Project, <br />as defined below) are to be applied to the Traffic <br />Mitigation Improvements Costs next incurred by the City. <br />The City, and not Developer, shall be responsible for <br />collecting from the Existing Funding Sources (and hereafter <br />from Contributing Projects, as aforesaid) all funds referred <br />to in this Section 3.2. After deducting the Existing <br />Funding Sources from the Estimated Traffic Mitigation <br />Improvements Costs, the remaining Traffic Mitigation <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.