Laserfiche WebLink
Exhibit A <br /> CEMETERY LANDSCAPE MAINTENANCE SCOPE OF WORK <br /> (To be used in conjunction with <br /> the City Standard Specifications and Standard Details, and <br /> the State Standard Specifications and Standard Plans) <br /> All work shall be in accordance with the City of Pleasanton Standard Specifications and <br /> Details dated November 2016. <br /> All work not specifically called out as "Extra Work" in the below scope of work sections <br /> shall be considered "Basic Maintenance". Refer to Exhibit C for the Pioneer Cemetery <br /> Maintenance Map. Maintenance responsibilities include the area highlighted in purple <br /> and pest and disease control for the entire cemetery as outlined in Section 5.06 Pest and <br /> Disease Control of this Scope of Work. Refer to Exhibit B for Fee Schedule. <br /> Item Description Quantity Unit Unit Price Total <br /> 1. Basic Maintenance 18 Month $2,407 $43,326 <br /> 2. Extra Work 1 Allowance $40,000 $40,000 <br /> Total: $83,326 <br /> Cemetery Scope of Work 2021 9-2 rev4 <br /> Rev. 11/29/2021 Page 1 <br />