My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:06:39 PM
Creation date
12/15/2021 3:06:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
EXPIRATION DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.06 Drainage Systems Maintenance <br /> A. All drainage systems on the properties for purposes of rain water or irrigation <br /> water collection, whether surface swales or underground pipes, shall be <br /> maintained in a clean condition free of debris, erosion waste,weeds or any <br /> blockage. Natural creeks and streams are not included. <br /> B. When a drainage system is blocked by debris from off the site or by erosion <br /> waste from off-site major storm damage, correction will be made by the City <br /> after prompt notification by the Contractor or considered"Extra Work"as <br /> approved by the City. <br /> 3.07 Erosion Control <br /> The Contractor shall not be responsible for structural maintenance or repair or <br /> replacement of the following: parking areas,drive aisles, or sidewalks except for such <br /> structural maintenance,repair or replacement resulting from damage caused by the <br /> Contractor or his agents. <br /> A. Erosion resulting from failure to maintain properly rooted plant material on <br /> slopes shall be the responsibility of the Contractor to correct and accomplish <br /> necessary cleanups. <br /> B. Erosion resulting from major storm damage that requires major slope <br /> reconstruction and/or installation of additional drainage facilities shall be the <br /> City's responsibility. <br /> 3.08 Records <br /> Written records of watering schedules, fertilization,pest control spraying, and other <br /> maintenance work shall be maintained by the Contractor. Written records describing all <br /> products and materials used during maintenance also shall be maintained by the <br /> Contractor. A copy of the record shall be provided to the City on a monthly basis. <br /> 3.09 Control, Supervision and Approval Authority <br /> A. Unless otherwise provided by specific provisions, Contractor's operations and <br /> activities pursuant to this agreement shall be under the control and supervision <br /> of the Director of Library and Recreation or her authorized representative, and <br /> such person shall exercise such control and supervision for and on behalf of <br /> the City where so designated in this agreement. <br /> B. Whenever,under the provisions of this agreement, the Contractor is prohibited <br /> from doing something unless Contractor first obtains the approval or consent <br /> of the City, such approval and consent must be obtained from the Director of <br /> Library and Recreation, or her authorized representative. <br /> 3.10 Graffiti <br /> Cemetery Scope of Work 2021 9-2 rev4 <br /> Rev. 11/29/2021 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.