My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 2:58:54 PM
Creation date
12/15/2021 2:58:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
EXPIRATION DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Downtown Revitalization District Parking In-Lieu Fee <br /> - When development within the Downtown Revitalization District is not able to accommodate all of its <br /> required parking onsite the following fee will be collected by the City to purchase land for and to construct <br /> - Subject to annual inflation adjustment on April 1 of any year in which the fee has not been recalculated, <br /> based on the annual change in Engineering News Record Construction Cost Index. <br /> Per parking space $21,940.53 <br /> F. Johnson Dr EDZ Transportation Development Fee '(due at time building permit is issued) <br /> Retail, per square foot $30.74 <br /> Office, per square foot $15.99 <br /> Hotel, per square foot $14.89 <br /> PMC 3.44.040 Subject to an annual inflation adjustment on January 1 of each year based upon the Engineering <br /> News Record Construction Cost Index(CCI)for the San Francisco Bay Area. <br /> G. Water Connection Fees - City <br /> For each single family house, or any other use that is determined by the City Engineer or the Engineer's duly <br /> appointed representative to have a water demand equivalent to that of a single-family house, for normal <br /> domestic-type water uses only, there shall be a connection fee charged for each service connection as <br /> indicated in the following table. This shall be the minimum charge for all uses. For all other uses, for each <br /> service connection, a charge shall be made as established in the following table depending on the size of the <br /> meter required for that service connection as determined by the City Engineer or his duly appointed <br /> representative. <br /> N. <br /> Pleasanton All Other Service <br /> Meter Size Improvemen Connections <br /> 5/8 inch (displacement type) $ 460 $ 1,200 <br /> 3/4 inch (displacement type) $ 690 $ 1,800 <br /> Amounts DO NOT include water meter 1 inch (displacement type) $ 1,150 $ 3,000 <br /> installation fees, which are revised periodically 1.5 inch (displacement type) $ 2,300 $ 6,000 <br /> based on current costs for labor& materials as 2" (displacement type) $ 3,680 $ 9,600 <br /> authorized in Section B "Water Meter& 2" Mueller MVR $ 5,290 $ 13,800 <br /> Installation Fees". 2" (OMNI C2) $ 7,360 $ 19,200 <br /> 3 inch (OMNI C2) $ 8,050 $ 21,000 <br /> 4 inch (OMNI C2) $ 23,000 $ 60,000 <br /> 6 inch (OMNI C2) $ 46,000 $ 120,000 <br /> 8 inch (OMNI C2) $ 80,500 $ 210,000 <br /> 10 inch (OMNI C2) $ 126,500 $ 330,000 <br /> For any larger service connection, the City Engineer or his duly appointed representative will determine <br /> the charge; or a battery of meters may be used at the City Engineer's option. <br /> Any change in use or addition requiring greater capacity will require the payment of additional fees at the <br /> rates established herein as a condition of continued service. <br />
The URL can be used to link to this page
Your browser does not support the video tag.