My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
122121
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 2:42:06 PM
Creation date
12/15/2021 2:42:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/21/2021
EXPIRATION DATE
12/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STREET NAME BEGIN LOCATION END LOCATION AREA(SF) <br /> KNOLL WOODS CT ROCKY CREEK PL END 9,255 <br /> In total, VSS International, Inc. installed 1,509,000 square feet of slurry seal on 58 <br /> sections of city streets for a total cost of $463,826. This included the $446,000 bid and <br /> one balancing change order in the amount of$17,826 based on actual field measured <br /> quantities compared to estimated bid quantities. <br /> Funding for this project totaled $625,000. The project expenditures, including <br /> advertising the bid, the construction contract, and testing and inspection totaled <br /> $470,355, leaving a remaining balance of $154,645. Staff recommends the transfer of <br /> the remaining balance to the Gas Tax— Fund 160. <br /> All the work has been completed to the satisfaction of the Director of Engineering and <br /> staff recommends that the project be accepted by City Council as complete. <br /> Submitted by: Fisc I eview: Approved by: <br /> l � /.0"1 <br /> Stephen Ki atrick f Tina Olson Brian Dolan <br /> Director of Engineering Director of Finance Interim City Manager <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.