Laserfiche WebLink
Exhibit B <br />Conditions of Approval <br /> <br />PSDR-182, Mike Szeredy/PeopleSoft <br />4500 PeopleSoft Parkway <br /> June 15, 2004 <br /> <br />The sign details shall be in substantial conformance to Exhibit A, dated "Received <br /> January 20, 2004," on file with the Pleasanton Planning Department, except as <br /> modified by the following conditions. Minor changes to the plans may be <br /> allowed, subject to the approval of the Planning Director if found to be in <br /> substantial conformance to the approved exhibits. <br /> <br />The proposed sign color change shall conform to the paint colors specified in <br /> Exhibit A, dated "Received January 20, 2004." <br /> <br />The sign shall be halo-illuminated. To minimize light pollution, there shall be no <br /> ground-mounted illumination of the sign. <br /> <br />The landscaping mound the sign shall conform to the landscaping plan dated <br /> "Received March 26, 2004," on file with the Planning Department. Prior to the <br /> final inspection of the sign, the new landscaping shall be installed per the <br /> submitted plan. If sprinklers are to the used to irrigate the landscape area around <br /> the monument sign, the sprinkler heads shall be directed away form the sign to <br /> avoid water directly spraying onto the sign. <br /> <br />The proposed Cedms deodar shall be a minimum of 15 gallons in size, and the <br /> proposed Dietes hybrids and Pyres Calleryana shall be a minimum of five gallons <br /> in size. <br /> <br />The applicant shall contact the Planning Depas'hnent to schedule a final inspection of <br /> the proposed signs and the required landscaping prior to a final inspection by the <br /> Building Department. <br /> <br />All appropriate City permits shall be obtained prior to the construction. <br /> <br />All <br /> <br />site improvements and construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. No construction shall be <br />allowed on Federal holidays. All construction equipment must meet DMV noise <br />standards and shall be equipped with muffling devices. <br /> <br />/en <br /> <br /> <br />