My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
110221
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 2:59:07 PM
Creation date
10/27/2021 2:31:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />Proposed New Primary Actions <br />Total Total City Total GHG Cumulative <br />Sector <br />Action Summary <br />Phasing <br />FTE5 Cost, Community Reduction in GHG Reduction <br />Cost 2030 through 2030 <br />Buildings and <br />1001 Adopt all -electric reach codes requiring <br />i 1 <br />electrification for new construction (exceptions <br />Near-term <br />0.10 $49,020 ($2,784,572) 2,628 10,136 <br />Energy <br />will be considered) <br />(0-3 years) <br />1164 Prepare and implement existing building <br />Buildings and <br />electrification plan (voluntary only) including <br />Mid-term <br />Energy <br />grid analysis, municipal building electrification, <br />(4-7 years) <br />0.06 $138,455 $137,032 4,357 16,511 <br />community electrification incentives and <br />outreach <br />1217 Modify definition of "covered project" in <br />Buildings and <br />the Pleasanton Municipal Code (PMC) Green <br />Near-term <br />0.02 $0 $287,074 279 1,290 <br />Energy <br />Building section to cover all new commercial <br />(0-3 years) <br />buildings and residential homes <br />Buildings and <br />1163 Encourage solar/batter on new <br />Y <br />Near-term <br />0.11 $0 $0 81 260g <br />Energy <br />developments <br />(0-3 years) <br />1056 Develop and implement a zero -emissions <br />vehicle infrastructure plan which expands <br />Transportation <br />, <br />community EV infrastructure, electrifies portions <br />Near-term <br />4.5 $217,582- ($31,005) <br />I 25,352 118,182 <br />and Land Use <br />' <br />of the municipal fleet, and bolsters community <br />(0-3 years <br />outreach and funding <br />1190 Electrify municipal small engine equipment <br />Transportation <br />(e.g., mowers and tractors) and reduce <br />Mid-term <br />0.35 $0 $0 <br />L <br />and Land Use <br />emissions of off-road equipment upon <br />(4-7 years) <br />replacement <br />Transportation <br />1115 Expand community small -engine <br />Near-term <br />0.23 $0 ($2,448,960) <br />1,446 6,250 <br />and Land Use <br />electrification e. , lawn mowers, leaf blowers) <br />0-3 ears <br />Transportation <br />1078 Require bicycle parking and amenities <br />Near-term <br />and Land Use <br />(e.g., showers) for new developments (includes <br />(0-3 years) <br />0.02 $0 $2,492,542 380 1,909 <br />1079) <br />5 Full-time equivalencies <br />(FTE) shown through action implementation (2031). <br />, Costs shown through action implementation (2031). Includes one-time and on-going costs. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.