Laserfiche WebLink
have a notation indicating the sheet(s) the point can be found. A special inspection by the <br /> Planning Division shall be coordinated with regards to exterior materials. Prior to building permit <br /> final, all of the green building measures indicated on the approved checklist shall be inspected <br /> and approved by either the City of Pleasanton, a third party rater, or the applicant shall provide <br /> written verification by the project engineer, architect, landscape architect, or designer. (Per PMC <br /> 17.50) <br /> Construction Practices and Noticing <br /> 20. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br /> Monday through Friday. No construction shall be allowed on State or Federal Holidays or <br /> Sundays. The Director of Community Development may allow earlier "start times" or later"stop <br /> times" for specific construction activities, e.g., concrete pouring. All construction equipment shall <br /> meet Department of Motor Vehicles (DMV) noise standards and shall be equipped with muffling <br /> devices. Prior to construction, the hours of construction shall be posted on site. <br /> 21. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br /> not allowed on the construction site except when needed as sleeping quarters for a security <br /> guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> 22. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br /> site for daily administration/coordination purposes during the construction period. <br /> 23. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br /> construction and parking management plan to address impacts and parking demands during the <br /> construction phase of the project. The construction and parking management plan shall be <br /> subject to review and approval by the City Traffic Engineer and Director of Community <br /> Development prior to issuance of a demolition permit, or the first building permit, whichever <br /> comes first. The following items shall be incorporated into the construction and parking <br /> management plan: <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, temporary <br /> fencing, construction trailer location, and construction contractors/workers parking <br /> area. <br /> c. Sidewalk closure or narrowing is not allowed during on-site construction activities <br /> without prior approval by the City. <br /> 24. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the project site <br /> and as far as possible from existing residences and shall be emptied to prevent odor. <br /> 25. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off-hauled from <br /> the site and disposed of in a lawful manner. No temporary stockpiling of dirt on this site shall <br /> occur without specific review and approval by the Director of Community Development. <br /> 26. NOTICE OF CONSTRUCTION: Prior to construction, the applicant shall notify neighbors within <br /> 300-feet of the project site of the construction schedule in writing. Such notice shall include <br /> contact names and numbers for property owner, agent or contractor. <br /> 27. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance coordinator" who <br /> shall be responsible for responding to any complaints regarding construction noise, dust, <br /> PUD-140 &P21-0079 City Council <br /> Page 4of13 <br />