Laserfiche WebLink
® Include lighting for the skatepark and pathways to improve safety in the park at <br />night <br />The city will be obtaining further public input as outlined in the below schedule. Once all <br />public input has been received and incorporated into a final conceptual design, the <br />consultant will also create an estimate of probable project costs. There is currently <br />enough funding for design, but no funding for construction has been identified. The <br />estimate will be utilized to identify the amount of funding required for the construction of <br />the project. <br />Schedule <br />The remaining public outreach and projected schedule for this project is as follows: <br />Public Event #2 (Farmer's Market) <br />City Council Meeting <br />Public Workshop #2 <br />Skatepark Survey #2 <br />Parks and Recreation Commission Meeting <br />Adoption by City Council <br />September 11, 2021 <br />September 21, 2021 <br />September 25, 2021 <br />late Sept./early Oct. 2021 <br />November 11, 2021 <br />Dec. 2021 /Jan. 2022 <br />Staff is requesting that City Council provide input on the design of the skatepark, <br />including preferred concept, preferred features and amenities, parking design, and <br />skatepark lights. <br />Submitted by: <br />Adam Nelkie <br />Acting Director of <br />Engineering <br />Attachments: <br />Heidi Murphy <br />Director of Library <br />and Recreation <br />Fiscal Review: Approved by: <br />Tina Olson Nelson Fialho <br />Director of Finance City Manager <br />1. Ken Mercer Skatepark Draft Concept 1 <br />2. Ken Mercer Skatepark Draft Concept 2 <br />Page 5 of 5 <br />