My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
100521
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2021 10:52:09 AM
Creation date
9/30/2021 10:52:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to <br /> review and approval by the City Landscape Architect prior to building permit issuance. <br /> OPERATIONS SERVICES DEPARTMENT— 925-931-5500 <br /> 83. SEWER CONNECTION: The projects sewer lateral shall connect to public sewer on <br /> Dennis Drive and the projects water service shall be connected to the water main on <br /> Dennis Dr. If there is an existing well on the property, there shall be an RP device <br /> connected to the water service after meter. The water and sewer connections shall be <br /> shown on the plans submitted to the Building and Safety Division and improvement plans <br /> submitted to the Engineering Department for plan check and shall be subject to the <br /> review and approval of the Operation Services Department prior to issuance of permits. <br /> Project specific condition. <br /> TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br /> Traffic Control <br /> 84. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br /> submitted to the City Traffic Engineer for review and approval. Best management <br /> practices to minimize traffic impacts shall be used during construction, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br /> have proper lane closure procedures such as flagger stations, signage, cones, and other <br /> warning devices implemented during construction. The TCP shall also include time of <br /> day/hours of lane closures and total number of days. <br /> 85. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br /> reviewed and approved by the City Traffic Engineer prior to building permit issuance and <br /> shall include the provision to monitor the street surfaces used for the haul route so that <br /> any damage and debris attributable to the haul trucks is identified and corrected at the <br /> expense of the applicant. <br /> 86. SIDEWALK: The project developer shall install a five-foot sidewalk along the project on <br /> Dennis Drive prior to occupancy of the new home on Parcel A. The sidewalk shall be <br /> shown on the plans submitted to the Building and Safety Division and improvement plans <br /> submitted to the Engineering Department and shall be subject to the review and approval <br /> of the Traffic Division prior to issuance of permits. Project specific condition. <br /> END <br /> PUD-140&P21-0079 City Council <br /> Page 15 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.