Laserfiche WebLink
82. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to <br />review and approval by the City Landscape Architect prior to building permit issuance. <br />OPERATIONS SERVICES DEPARTMENT — 925-931-5500 <br />83. SEWER CONNECTION: The projects sewer lateral shall connect to public sewer on <br />Dennis Drive and the projects water service shall be connected to the water main on <br />Dennis Dr. If there is an existing well on the property, there shall be an RP device <br />connected to the water service after meter. The water and sewer connections shall be <br />shown on the plans submitted to the Building and Safety Division and improvement plans <br />submitted to the Engineering Department for plan check and shall be subject to the <br />review and approval of the Operation Services Department prior to issuance of permits. <br />Project specific condition. <br />TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br />Traffic Control <br />84, TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and other <br />warning devices implemented during construction. The TCP shall also include time of <br />day/hours of lane closures and total number of days. <br />85. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br />reviewed and approved by the City Traffic Engineer prior to building permit issuance and <br />shall include the provision to monitor the street surfaces used for the haul route so that <br />any damage and debris attributable to the 'haul trucks is identified and corrected at the <br />expense of the applicant. <br />86 SIDEWALK: The project developer shall install a five-foot sidewalk along the project on <br />Dennis Drive. The sidewalk shall be shown on the plans submitted to the Building and <br />Safety Division and improvement plans submitted to the Engineering Depart rent and <br />shall be subject to the review and approval of the Traffic Division prior to issuance of <br />permits. Project specific condition. <br />END <br />PUD -140 & P21-0079 Planning Commission <br />Page 15 of 15 <br />