My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 10:24:26 AM
Creation date
9/16/2021 10:22:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
Document Relationships
05 ATTACHMENT 1 EXHIBIT B
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
05 ATTACHMENTS 2-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\092121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82. SITE LIGHTING: All site lighting shall be Dark Sky Compliant and shall be subject to <br />review and approval by the City Landscape Architect prior to building permit issuance. <br />OPERATIONS SERVICES DEPARTMENT — 925-931-5500 <br />83. SEWER CONNECTION: The projects sewer lateral shall connect to public sewer on <br />Dennis Drive and the projects water service shall be connected to the water main on <br />Dennis Dr. If there is an existing well on the property, there shall be an RP device <br />connected to the water service after meter. The water and sewer connections shall be <br />shown on the plans submitted to the Building and Safety Division and improvement plans <br />submitted to the Engineering Department for plan check and shall be subject to the <br />review and approval of the Operation Services Department prior to issuance of permits. <br />Project specific condition. <br />TRAFFIC ENGINEERING DIVISION — 925-931-5677 <br />Traffic Control <br />84. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and other <br />warning devices implemented during construction. The TCP shall also include time of <br />day/hours of lane closures and total number of days. <br />85. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br />reviewed and approved by the City Traffic Engineer prior to building permit issuance and <br />shall include the provision to monitor the street surfaces used for the haul route so that <br />any damage and debris attributable to the haul trucks is identified and corrected at the <br />expense of the applicant. <br />86. SIDEWALK: The project developer shall install a five-foot sidewalk along the project on <br />Dennis Drive prior to occupancy of the new home on Parcel A. The sidewalk shall be <br />shown on the plans submitted to the Building and Safety Division and improvement plans <br />submitted to the Engineering Department and shall be subject to the review and approval <br />of the Traffic Division prior to issuance of permits. Project specific condition. <br />END <br />PUD -140 & P21-0079 City Council <br />Page 15 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.