My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 9:24:27 AM
Creation date
9/16/2021 9:24:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-07 Debris Control <br /> The property shall be reviewed weekly to ensure that debris such as bottles, papers, <br /> cartons, and similar items are disposed of to keep the grounds neat in appearance. <br /> 3-08 Aerification <br /> Aerification of turf to improve water penetration as needed, but no less than twice yearly <br /> (March and September). <br /> SECTION 4. ORNAMENTAL PLANT MATERIAL AND GROUND COVER <br /> 4-01 General <br /> The Contractor shall maintain all ground cover, including hard fescue areas, on the site(s) <br /> covered by this agreement in a healthy, thriving condition by performing the following <br /> operations and other work incidental thereto: <br /> 4-02 Weed Control <br /> Eliminate weeds, including undesirable grasses such as tall fescue, nut grass, rye, etc., <br /> preferably with pre-emergent herbicides, but also with selective systematic herbicides. <br /> Hoe weeds as little as possible since this may result in plant damage. Hand-pull weeds <br /> that are not effectively controlled by chemical herbicides. <br /> A. All planting beds and graveled areas shall be kept weed free. <br /> B. All debris resulting from weeding operations shall be removed from the project <br /> area on the same day that the weeding operation occurs. <br /> C. Should the Contractor desire to use a chemical weed control program, he shall <br /> develop said program and submit it in writing as part of this bid. The City shall be <br /> notified at least seven (7) days before each use. Credit for herbicide application <br /> (pre-and post-emergent)will only be given when Contractor notifies the City prior <br /> to said application. <br /> D. All tree wells are to be kept weed and grass free for an area extending out a <br /> minimum of 2.5 feet from the trunk of the tree in any direction. (See also Sections <br /> 5 and 6 under Shrub and Tree Care.) <br /> 4-03 Ground Cover Areas <br /> All ornamental plant material and ground covers shall be judiciously pruned maintaining <br /> the natural structure of the plant. All vegetation shall be maintained six inches away from <br /> structures and clear of all walkways. Perform edging so that groundcover "feathers back" <br /> from border of groundcover area, forming a natural appearance; do not shear or create <br /> vertical edges. <br /> Ground covers shall be kept a minimum of 12 inches from the bases of shrubs and trees. <br /> 4-04 Vines <br /> Vines growing on walls in street median areas shall be kept at all times at least 2 feet <br /> below the top of any wall on which they are climbing. <br /> Vines shall not be allowed to grow on the walls at Fire Station locations. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.