My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
092121
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 9:21:22 AM
Creation date
9/16/2021 9:21:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Reservoir Cathodic System Inspection <br /> Bid#OSD 2021-605 <br /> 4. COMMENCEMENT AND COMPLETION OF WORK <br /> Work shall begin only after all equipment has been procured and is ready for installation. The work at <br /> each site is expected to be completed within 2 weeks of agreed upon start date. Schedule amendments <br /> must be approved by Utilities Division Supervisors. <br /> RATE SHEET <br /> The cost quoted below shall include all taxes and all other charges, including travel expenses, and is the <br /> cost the City will pay for the term of any contract that is a result of this bid. <br /> Bidder hereby certifies to City that all representations,certifications,and statements made by Bidder,as <br /> set forth in this Bid Form and attachments are true and correct and are made under penalty of perjury <br /> pursuant to the laws of California. <br /> Contractor's Labor Rates(Hourly) <br /> Position Description Regular Time Overtime Emergency Callout <br /> Foreperson, $ 185 $ 220 $ 250 <br /> Journey level: $ 150 $ 180 $ 210 <br /> Apprentice level: S too $ 120 $ 140 <br /> Other: $ $ $ <br /> UTILITIES—Cathodic System(Continued) <br /> RATE SHEET (continued) <br /> Contractor's Equipment <br /> Equipment Size and Description Hourly Rate <br /> CP Testing Equipment $ 30 <br /> CP Rectifier(Portable) $ 30 <br /> Generator $ 20 <br /> $ <br /> Note: Contractor's Equipment that will be used for project,to be charged to the job at an Hourly Rate. <br /> Misc.Costs Description Cost <br /> Disposal Fees Material Hauling&Disposal 0 <br /> Rate Sheet <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.