Laserfiche WebLink
EXHIBIT A "Seder& Storm Flushing& CCTV Sem ices" <br /> Bid#OSD 2021-603 <br /> UTILITIES—SEWER AND STORM (Continued) <br /> RATE SHEET (continued) <br /> Contractor's Equipment <br /> Equipment Size and Description Hourly Rate <br /> Combo Truck Water Jetting and Vacuum Sewer& Storm Lines S 300.00 <br /> CCTV Truck Ability to TV lines from 6"to 48" + $ 300.00 <br /> Traffic Control Traffic Control Equipment $ <br /> 50.00 <br /> Note: Contractor's Equipment that will be used for project,to be charged to the job at an Hourly Rate. <br /> Misc. Costs Description Cost <br /> Material,Debris Disposal Waste hauling and Disposal Fees $260/TON <br /> Materials/Rentals/ <br /> Subcontractors Example % Mark Up <br /> Materials Invoicing must be demonstrated as a percentage. 15 % <br /> Example:Material$1,000+10%($100)=$1,100 <br /> *Outside Equipment(Rentals) Invoicing must be demonstrated as a percentage <br /> Example.Outside Equipment$2,000+ 10%($200)=$2,200 15 '0 <br /> Traffic Control Invoicing must be demonstrated as a percentage. 25 % <br /> Example Material$1,000+ 10%($100)=$1,100 <br /> *Rental Equipment must be pre-approved by City Project Manager <br /> Contractor Name:Pipe and Plant Solutions,Inc. Signature: • ' <br /> »i lam ir'!rtin ► 'res .ent <br /> Rate Sheet <br /> Page 5 of 5 <br />